BYM213 Two-color Non-filled Pitching Field Artificial Turf_SupplyPro Co., Ltd._Qingdao Baoxiangyuan Artificial Turf Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

BYM213 Two-color Non-filled Pitching Field Artificial Turf

产品Price 2.00/square meter

最小起订Quantity:100 square meter 供货总Quantity: 15000 square meter

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shandong/Qingdao
有效期至:
长期有效
最后更新:
2022-06-27 13:45
Product Details

Highness

Density

67,200

Line spacing

3/16

BYM219 Artificial Turf for Basketball Courts

Height: 19mm

Line Spacing: 3/16 inch

Material: PP

Density: 67,200 clusters/sq. ft.

Adhesive Backing: Styrene-Butadiene Rubber (SBR)

Base fabric: Grid base fabric

Year: 6 years

Width: 4 meters

Transportation: Logistics Distribution

IMG_2409.JPG

This product is a dual-color flexible fiber, designed for senior's golf ball court. Made of wear-resistant and anti-aging polypropylene, the widened and thickened grass fibers offer superior tensile strength.

Service life of not less than 6 years.The grass fibers are woven using the tufted technique, with a non-directional design that enhances the smooth running of the golf balls and uniform friction.

Artificial Turf Gateball Court Size: The playing area dimensions are typically 20 meters by 15 meters, or 20 meters by 25 meters, with a surrounding auxiliary area of at least 1 meter.

Region, surrounded by a well-built ball stop wall.A 20m x 15m site, the finished size is generally not less than 22m x 17m.

IMG_2269.JPG

Preparation before bonding artificial putting green turf:

1. The grass carpet base, non-woven fabric, seam fabric, etc., to be bonded must be cleaned thoroughly and should be dry with no moisture on the surface.

2. It is recommended to conduct construction at temperatures above 5°C; avoid working during rainy or plum rain seasons, as this may lead to excessively long adhesive curing times.

Causes non-stick phenomena.

Detailed installation process for a putting green artificial turf:

1. Gluing: It is required to apply the glue evenly on the surface with a brush, without reapplying repeatedly, as this may cause bubbling and even falling off. Base fabric

Apply glue evenly, strictly controlling the thickness, and pay attention to the appropriate gluing speed. Apply the glue separately to the two bonding surfaces.

2. Adhesion: Adjust the curing time based on the actual effects of temperature, humidity, and atmospheric pressure at the time. Generally, it is 10-30 minutes after the adhesive is applied.

Within minutes, the adhesive reaches 80-90% dryness, and it should not stick to the skin when touched. During bonding, it is required to align and secure the adhesive in one go. Never move the bonded item back and forth after bonding.

The object being handled.

3. Pressure Application: After bonding, clean the surface debris, and then use a rubber mallet to firmly hammer from the bonding area towards both sides, ensuring the surface is fully sealed.

Tight and dense, ensuring stronger bonding.

4. Curing: The curing time is typically three days, with the detection strength being evaluated after ten days. Therefore, close attention must be paid to maintenance during the curing period.

Avoid excessive sun exposure, water immersion, and movement to achieve the bonding state.

5. Clean the chopped grass fragments from the site after cutting but before spreading quartz sand and rubber granules.

timg.jpg

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
0532-80762362

QQ Service

QQ Service:
906640108

Back to Top