How is the installation process for membrane structure carports? What are the steps for membrane structure installation? Below, Chenxu Membrane Structure introduces them to you. The membrane installation of membrane structure carports consists of four parts: membrane unfolding, connection and fixation, hoisting into place, and tensioning.
Step 1: Membrane Structure Installation: Unfolding the Membrane Body
Prior to unrolling the membrane, lay temporary fabric on the platform to protect the membrane from damage and maintain its cleanliness. Strictly unfold the membrane in the established order. Before opening the packaging, verify the markings to ensure the installation location is correct and unfold in the marked direction, endeavoring to minimize movement of the unrolled membrane within the site. When walking on the unrolled membrane surface, wear soft-soled shoes and avoid carrying hard objects to prevent scuffing of the membrane.
Step 2: Membrane Structure Installation - Connection and Fixing
After deploying the membrane on the platform, connect and secure it to the cables using clamps. The specifications of the clamps and the spacing between them must be installed strictly according to the design requirements. For one-time hoisting of the membrane, the clamping bolts and nuts must also be tightened in one go.
Step 3: Membrane Structure Hoisting into Position
Currently, the installation of cable membrane structures predominantly employs the multi-point overall lifting method. This involves modifying the mature "lifting" technology to be used in the construction process of this flexible structure. The process requires synchronization throughout. During the lifting, control the speed and distance of each lifting point to ensure uniform force transmission across the membrane surface.