Procedure for Calibration of Measuring Voltage Transformers_Technology Center Co., Ltd._Wuhan E'dian Electric Power Test Equipment Co., Ltd._Zhongshang 114 Industry Resources Network 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Wuhan E'dian Electric Power Test Equipment Co., Ltd.

Environmental equipment, instruments and meters, robots, ...

24-hour Service Hotline
13808660749
400-034-8088
Current Location:Home>Technology Center Co., Ltd.>Procedure for Calibration of Measuring Voltage Transformers

    Procedure for Calibration of Measuring Voltage Transformers

    2024-03-18

    I. Key Features

    Lightweight, aesthetically pleasing, and wide current range.

     

    II. Main Technical Indicators

    1No Chinese content provided.

    Please provide the Chinese content you would like translated into American English.   Degree:540℃ Humidity:80(25)

         Elevation: 1500m   Power Frequency:50Hz

    2Rated Capacity:2.5-80VA   O-3.2Ω)

    3Measurement Range:5%-120%

    4Secondary Current:  5A1A

    5Power Factor:0.81.0

    6Accuracy: ±3

    7Test Voltage:2kV

     

    Usage Guide

    1Connect this device to the tested current transformer.K2With the validatorTxBetween.

    2Adjust the load to the actual secondary load of the tested current transformer.

    Note:Secondary loads of some current transformers are represented by resistance.,Ω.The load of a current transformer load box is generally expressed in terms of capacity.VA.The conversion relationship is::

    Capacity(VA)=Resistance value(Ω)*Secondary Current(A)* Secondary Current(A)

    1Ensure proper grounding of this equipment.

    Caution: To ensure the accuracy of the secondary load of the transformer, the total resistance value of the two connection lines at the secondary terminal of the transformer must be connected to the load box.0.06If a secondary link-up verification instrument is used, the load caused by the secondary of the transformer should also be taken into account to ensure accuracy.




Contact us

Wuhan E'dian Electric Power Test Equipment Co., Ltd.
Service Hotline 13808660749
Company Phone 400-034-8088
Company Address North of Guantan Second Road, Qiaokou District, Wuhan, Building 4, 1st Floor, Room 17 (HSBC Corporate Headquarters)

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》