Local Discharge Online Monitoring for Cables_Technology Center Co., Ltd._Wuhan E'dian Electric Power Test Equipment Co., Ltd._Zhongshang 114 Industry Resources Network 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Wuhan E'dian Electric Power Test Equipment Co., Ltd.

Environmental equipment, instruments and meters, robots, ...

24-hour Service Hotline
13808660749
400-034-8088
Current Location:Home>Technology Center Co., Ltd.>Local Discharge Online Monitoring for Cables

    Local Discharge Online Monitoring for Cables

    2024-04-07

    1. Cable Testing Requirements and Preparations Prior to Testing

    1)Prior to partial discharge testing, disconnect and ground the cable, leaving both ends suspended, and set up the safety perimeter fence.

    2) Minimize the cable joint areaPTDisconnection of lightning arresters and other equipment.

    3) Ensure the cable ends are clean and maintain sufficient insulation distance from the surrounding grounding parts.

    4) Collect cable parameters such as length, model, type, and commissioning date.

    5) Cable Length L: Measurement method for one side of the cable: 50m ≤ L ≤ 3km;

    Measurement Method at Both Ends of the Cable:L>3km。

     

    2. Insulation Resistance Testing

    The main insulation resistance test for the 10kV cable was conducted using a 2500V insulation megger, with no significant change in insulation resistance observed before and after the test; the insulation resistance for the 10kV cable's main insulation resistance test must be greater than 50MΩ to proceed to the next phase of testing.

     

    3. Test the intermediate joint position of the cable and the cable length

    AdoptSEBAKMT Easyflex ComMultifunctional Pulse Reflectometer (as shown in the figure)2) Conducted tests on the entire cable length and intermediate joint positions to measure cable length and joint locations, as well as to pre-locate faults such as short circuits and open circuits.

    Testing Requirements:

    1) The full length of the cable must be accurate for calibration purposes.

    2) Ensure intermediate joint measurements are as accurate and detailed as possible, which is beneficial for determining the final location of partial discharge.

    3) Measurement Range:50m15000mThe measurement range needs to be adjusted according to the cable length.




Contact us

Wuhan E'dian Electric Power Test Equipment Co., Ltd.
Service Hotline 13808660749
Company Phone 400-034-8088
Company Address North of Guantan Second Road, Qiaokou District, Wuhan, Building 4, 1st Floor, Room 17 (HSBC Corporate Headquarters)

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》