Lightning Rod Installation Methods and Measures_News Center Co., Ltd._Guangdong Leibang Lightning Protection Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Guangdong Leibang Lightning Protection Technolog

From design planning, blueprint drafting, construction, inspection and accept...

13822256985
 

News Category
  • No Category

Contact Information
  • Contact person:肖健明
  • Telephone:13822256985
  • Mobile:13822256985
  • Address:No. 04, Unit 2, Building 1, Hengyu Century Plaza, 1 Hechang 3rd Road, Zhongkai High-tech Industrial Development Zone, Huizhou City
Home > News Center Co., Ltd. > Lightning Rod Installation Methods and Measures
News Center Co., Ltd.
Lightning Rod Installation Methods and Measures
Publish Time:2023-08-07        View Count:41         Return to List

All metal parts must be galvanized; be cautious to protect the galvanized layer during operation.

The needle tips are made from galvanized steel pipes, with a wall thickness of not less than 3mm. The length of the tinned needle tip should be no less than 70mm. Lightning rods should be installed vertically and securely. The allowable deviation in verticality is 3/1000.

Welding requirements: The welding should be done using lap welding, with the lap length complying with the following specifications: for flat steel, it should be 1/3 of its width (and at least three edges should be welded).

The round steel is six times its diameter.


 Click submit means you agree to《Service terms》《Privacy policy》

13822256985