The construction of biogas enamel-lined storage tanks should pay attention to five details._News Center Co., Ltd._Qingdao Haoyue Membrane Structure Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Qingdao Haoyue Membrane Structure Engineering Co., Ltd.

Qingdao Haoyue specializes in double-membrane biogas storage tanks, enamel el...

Consultation Hotline
18906399700

Product Categories
Home > News Center Co., Ltd. > The construction of biogas enamel-lined storage tanks should pay attention to five details.
News Center Co., Ltd.
The construction of biogas enamel-lined storage tanks should pay attention to five details.
Publish Time:2022-12-28        View Count:48        Return to List

Enamel-lined assemblage drum作为钢制储罐,是用于畜牧养殖/工矿/市政废水处理、餐厨垃圾处理和沼气工程及粮油原料储罐等专业设备,适用于CSTR/USR/UASB/IC/EGSB等加工技术。但在沼气工程建设项目中,青岛海越沼气柜厂家hyhbm.com储气柜公司带你了解Enamel-lined steel drum assembly projectFive Key Construction Details
 
Inward-sloping foundation structure details:
Before constructing modular tanks, the ground site should be cleared, and the surface flatness of the ordinary concrete foundation should be controlled within ten millimeters. The concrete must not have any convexity, looseness, cracks, pitting, bulging, or peeling phenomena and should be compacted and leveled.
② Construction Details of Polyurethane Waterproof Coating:
Before painting the inward-tilted foundation structure, its surface turns grayish-white, the moisture content of the casting surface is below 10%, and it must wait 24 hours after the operation before proceeding with the polyurethane waterproofing work.
③ Waterproofing Protective Layer Working Details:
After two days of waterproofing operations, the waterproof protective layer should be directly poured. The pouring height equals the sea...The secondary pouring height of the vitreous enamel lined steel drum is 45 degrees inclined. The concrete strength should reach 34.5 MPa, and the amount of waterproofing agent should be mixed with the amount of cement, achieving S3 waterproofing strength. The construction site should be kept clean, and the construction method should follow the manufacturer's instructions. Please note, do not damage the polyurethane waterproofing layer.
Upon completion of construction, the surface smoothness, the integrity of the concrete surface, and the specifications and styles should be inspected. Regular maintenance of the concrete should be conducted, and water filling tests for the assembled tank can be performed after two weeks.
Inspect the detailed dimensions of the enamel-lined steel drum: The allowable deviation of the height of the Haiyue drum body cannot exceed 0.5% of the designed height, the deviation in verticality should not exceed 0.4% of the drum wall height, and it must not exceed 50mm. The assembly of the enamel-lined steel drum body is complete, with local unevenness and deformation on the drum wall to be gradual, and the Haiyue drum wall should not have undulations. Local bumps and deformation are permitted. The deviation of the inner surface radius of the bottom ring wall at a height of one meter from the bottom is allowed to be measured. When the inner diameter is less than or equal to 12.5 meters, the deviation should not exceed ±13mm; when the inner diameter is greater than 12.5 meters but less than 45 meters, the deviation should not exceed ±19mm. Reminder: The protective layer of polyurethane waterproofing must not damage the waterproof material. It should be cleaned.Biogas Assembly TankEngineeringWeld marks on the assembly slot walls should be polished smooth.