Dredging Ship Construction Method_News Center Co., Ltd._Dredging Ship Construction Method,Shandong Haohai Dredging Equipment Co., Ltd._Shandong Haohai Dredging Equipment Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong Haohai Dredging Equipment Co., Ltd.

Shipbuilding; Ship Sales; Ship Design

Consultation Hotline
400-1525-377  18853613367
 

Company Information

Location:Shandong/Weifang

会员级别:数字营销4

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Shandong Haohai Dredging Equipment Co., Ltd.
  • 联 系 人王总 (先生)
  • 公司电话400-1525-377
  • 手机号码18853613367
  • Company Address808 Rongli Street, Qingzhou Economic Development Zone, Shandong Province
home > News Center Co., Ltd. > Dredging Ship Construction Method
News Center Co., Ltd.
Dredging Ship Construction Method
Publish Time:2023-06-08        View Count:17        Return to List

As the times progress and society rapidly develops, ecological civilization construction is increasingly thriving. The team for sediment removal projects is gradually expanding, with dredging vessels becoming the main force. Mastering the proper construction methods for dredging vessels is crucial for enhancing their efficiency. Below is a brief introduction to the construction methods of dredging vessels.

Before dredging operations, control guides are set along both banks of the excavation channel, fixed, prominent control piles are established at each section, and colored flags of different hues are used to mark the left and right opening lines of the river channel to ensure that the deviation of the river centerline does not exceed the design requirements. Water levels are installed on the winch frame to control the depth, allowing for real-time observation and timely adjustments to the dredging depth.

a. Direction of Excavation Determination: To analyze the impact of water flow direction on the construction efficiency of the dredging ship, both downstream and upstream excavation tests were conducted during the construction process. The results show that the efficiency of the downstream excavation for sediment removal is lower, with a sand content of approximately 7% to 10% (by volume, as follows), while the upstream excavation is more efficient, with a sand content reaching 10% to 12%, up to 17%. Additionally, during downstream excavation, due to water pressure, the underwater pipeline for transporting sediment is prone to bending, which affects the construction to some extent; however, during upstream excavation, the pipeline remains clear.

b. Slope Excavation: Designed with a slope excavation ratio of 1:5, the excavation method follows the technical specifications for dredging construction, utilizing a stepped excavation technique with lower overburden and upper underburden, allowing natural collapse to form the slope, with a slope ratio close to 1:4-1:6.

This is a brief introduction to the main functions and construction methods of dredging vessels, hoping it is helpful to you. Meanwhile, we welcome you to visit our business office for negotiations and a win-win cooperation!