Installation Process for Insulating Composite Panels_News Center Co., Ltd._Installation Process for Insulating Composite Panels,Shandong Hengrui New Building Materials Co., Ltd._Shandong Hengrui New Building Materials Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong Hengrui New Building Materials Co., Ltd.

Fly ash aerated concrete blocks and panels research, development, production, sales, and installation; production and sales of mobile buildings; import and export of goods; sales of hardware, building materials, fly ash and its products, decorative materials, electromechanical equipment (excluding passenger vehicles with 9 seats or fewer), chemical products (excluding hazardous and easily produced toxic chemicals), plastic products, kitchen and bathroom appliances, plumbing pipes, metal materials, valves and fittings, switches and sockets, electrical wires and cables, plastic steel windows and doors, door and window profiles, wooden products, cement, ready-mixed concrete, office supplies, and daily necessities.

Service Hotline
13335130966


Company Information

Location:Shandong/Zibo

会员级别:标王4

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Shandong Hengrui New Building Materials Co., Ltd.
  • 联 系 人王令涛 (先生)
  • 公司电话13335130966
  • 手机号码13335130966
  • Company AddressShandong Province, Zibo City, Linzi District, Yanghuyacun Industrial Park, Jinshan Town

News Category
  • No Category
Home > News Center Co., Ltd. > Installation Process for Insulating Composite Panels
News Center Co., Ltd.
Installation Process for Insulating Composite Panels
Publish Time:2022-03-08        View Count:59        Return to List

First, address the foundation layer ensuring no hollowing or falling off; ensure the leveling is in place. Next, measure the exterior wall and draw the baseline and make marks according to the measurements. Then, apply the thermal insulation sandwich panels to the foundation layer using砂浆of uniform and moderate consistency in line with the baseline. Depending on the situation, choose an appropriate anchoring method, apply masking tape on both sides of the grooves, and evenly fill the sealant into the joints while using a straight-edged scraper to level it. Once dry, peel off the masking tape and clean the panel.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13335130966