Field Ventilated Plastic Track Construction Technology
Substrate Laying:
Before laying the sub-base material, clean the foundation thoroughly, prepare the construction tools, and adjust the machine and its thickness according to the requirements of the construction drawings. The court features a breathable plastic track.
b. Rationally divide the construction sections according to the engineering status, measure the position of the construction lines, and set up the construction lines. Maintain consistent thickness of rubber particles during the laying process, ensuring seamless and traceless joints.
c. Prior to laying the substrate, use a base adhesive and black granules to level out the areas of the foundation with significant indentations, and knock down any protrusions to achieve a smooth surface.
d. Prior to laying the underlay, thoroughly clean the sub-base and apply a layer of primer. Then, lay the black granular layer while brushing. Applying the black granular layer after the adhesive has cured will affect adhesion. It is not advisable to apply a large area of adhesive before laying the black granular layer. The amount of adhesive layer applied should correspond to the immediate area of black granular layer to be laid. Permeable plastic track for sports fields.
During the laying process, the laying personnel must ensure uniform machine walking speed. The trimming personnel should be skilled and promptly apply adhesive to exposed and concave areas, level out any protrusions, and maintain neat and even edges. There should be at least two trimming personnel.
After the black oak granules are laid and cured, a thorough inspection of the entire area is conducted. Any uneven edges or bumpy spots are to be trimmed, sanded, filled with glue, and corrected to ensure the even thickness of the surface adhesive.
③ Runway surface coating application:
After the black rubber granule layer has cured and formed, the adhesive layer (usually red) can be sprayed on its surface. The ratio is: EPDM granules to PU paste = 1:1.2. First, mix the PU paste with the appropriate amount of activator according to the ratio, then stir well. Add the EPDM granules during stirring, with the particle size selected as required, generally around 0.5-1mm. Pour the mixture into a professional sprayer and spray it onto the surface of the black rubber granule layer. Depending on the consistency of the adhesive, add a suitable amount of thinner. Spray evenly twice.
b. Before applying the spray glue, the workers must calculate the amount of adhesive needed, the length of adhesive applied per bucket, and make clear markings to ensure they have a clear understanding and make reasonable use of materials. The court features a breathable plastic track.
Ensure material handling is clean and quick, pour in stages during the transfer, and promptly clean up any excess material at the bucket's edge to maintain cleanliness outside the bucket, creating a favorable condition for the adhesive applicator.
④ Measurement and marking of the production line.
Xiamen Hongtong Flooring Company specializes in a variety of flooring projects, including industrial flooring, epoxy flooring, garage epoxy flooring, anti-slip epoxy trowel finish flooring, sealant curing agent flooring, retro flooring, waterborne epoxy flooring, acrylic court flooring, and silicone PU flooring.