5 tons Foton H2 Sprinkler Truck_SupplyPro Co., Ltd._5-ton Foton H2洒水 truck, available, Hardware Tools Website, machine tool accessories, general parts_Huamei Special Vehicle Co., Ltd. of Xuyi City_Zhongshang 114 Industry Resources Network

Huamei Special Vehicle Co., Ltd. of Xuyi City

Sprinkler Trucks, Garbage Trucks, Sludge Removal Trucks, ...

全国服务咨询热线:
15272867211  15272867211


5 tons Foton H2 Sprinkler Truck

价      格Negotiable

最小起订0 Piece库存0 Piece

Location
Hubei Suizhou
有效期至
长期有效
最后更新
2022-03-23 14:44
View Count
48

Business Card

  • Your company's名称Huamei Special Vehicle Co., Ltd. of Xuyi City
  • 联 系 人谢海平 (先生)
  • Your company'sPhone15272867211
  • Mobile号码15272867211
  • Company AddressXiaowan Village, Zaoyuan Town, Economic and Technological Development Zone, Suizhou City

买家正在看

  • 14 Cubic Hua Shen F5 Sprinkler Truck

    10000.00

  • Dongfeng Tianjin Sweeping and Washing Vehicle

    Negotiable

  • 12-ton Dongfeng Dollyka D9 Mist Spraying Truck

    10000.00

  • 14 cubic meters Dongfeng Tianjin Sprinkler Truck

    10000.00

Product Details


The water tanker tank is elliptical or square-circular in structure, made of Wuhan Iron and Steel carbon steel, formed in one go using a large-scale roller machine, with advanced equipment for automatic welding, resulting in a more aesthetically pleasing appearance. The entire tank body has a 2-3 compartment water storage, with a through-hole at the bottom of the middle partition. The tank is equipped with anti-vibration and wave partitions inside, and the interior partitions serve as wave prevention, reducing the impact of liquid inside the tank during vehicle travel. The exterior is coated with anti-rust and decorative paint, and the interior is treated to prevent rust.

When using rivers or ponds as water sources for sprinkler trucks, ensure the entire end of the suction pipe is submerged in the water. To prevent the intake of stones or excessive silt and debris, install a filter device at the water intake of the suction pipe. If the water source is shallow, dig the intake area deeper in advance to ensure it's free of debris and air.

2. For the first use of the self-priming pump, priming water is required; thereafter, no additional priming is necessary. The suction pipe system must maintain a certain vacuum during water intake to draw water into the tank. The suction pipe system must be sealed and reliable; the hose cannot be damaged and the rigid pipe cannot have cracks, otherwise air leakage will occur, resulting in failure to draw water.

3. The take-off device must be engaged while parked, whether before the water truck starts to suck water or before it sprays. Before winter arrives, the water in the pump and water pipes should be drained to prevent freezing and cracking. In northern China, construction typically ceases during severe winters, so after completion, the water in the pump and pipes should be immediately drained to avoid future issues.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15272867211