1-200 cubic meters steel-lined PTFE storage tank_SupplyPro Co., Ltd._Wuxi Huashun Anticorrosion Container Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
13921511789
 

Product Categories
  • No Category

Contact Information
  • Contact person:张总
  • Telephone:13921511789
  • Mobile:13921511789
  • Address:38 Luoyang North Road, Shuangmiao Village, Luoshi Town, Wuxi City, Huishan District
Home > SupplyPro Co., Ltd. > 1-200 cubic meters steel-lined PTFE storage tank
1-200 cubic meters steel-lined PTFE storage tank
品牌: Hua Shi Shun
Origin: Wuxi
Custom Manufacturing: Is
Performance: Corrosion-resistant, leak-proof, non-flaking
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2025-05-09 14:22
 
详细Info

Pre-treatment

The inner surface of the lining equipment is degreased with solvents and dried, followed by sandblasting with 46# steel grit. The surface that has been sandblasted is then cleaned with trichloroethylene and dried.

Surface paint treatment on the bottom

Section 3: Adhesive Coating

Apply a uniform layer of special adhesive to the product's inner surface. Similarly, coat the adhesive on the back of the composite board, then align and affix the board in place.

Four: Paste

After aligning the adhesive-coated composite panel, apply it first, then use local heating and rolling to expel the air trapped in between, ensuring a tighter fit for the 3mm or 4mm polytetrafluoroethylene sheets.

Five. Weld seam

Once the composite boards are fully bonded, use a professional notching machine to create "V" shaped long grooves at the joint between the two boards, and clean out any debris from the gaps.

Welding

Utilizing imported high-temperature welding torches, welding is performed with Φ3.5mm PFA rods in the center of grooved plate seams, ensuring seamless bonding of the composite panels without impurities, bubbles, or gaps. After completing the overall welding, a pinhole tester is used to test at 15,000 volts to check for any micro-holes and make necessary repairs. Upon completion, an imported grooving machine is used to flatten any protruding weld rods on the composite panel surface. Then, a 20mm-wide welding strip is applied to reinforce the original welds, ensuring the welding joints are secure and free of micro-holes. Finally, a 30,000-volt voltage test is conducted to confirm the absence of pinholes and verify the welding integrity.

Section 7: Inspection


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

13921511789