Installation Requirements and Construction Precautions for Geotextile Membranes_News Center Co., Ltd._Chongqing JinYi Building Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
  
News Category
  • No Category
Home > News Center Co., Ltd. > Installation Requirements and Construction Precautions for Geotextile Membranes
News Center Co., Ltd.
Installation Requirements and Construction Precautions for Geotextile Membranes
Publish Time:2023-03-29        View Count:75         Return to List

Basic Requirements for Geotextile Laying:

Seams must intersect with the slope face line; at the base of the slope or areas where stress may occur, the distance of the horizontal seams must be greater than 1.5 meters.

2. Foundation Inspection: Ensure the foundation is level and solid; if any foreign objects are found, they should be handled properly without delay.

Important Considerations for Geotextile Installation and Construction

Geotextiles can be cut using a fabric knife (hook knife) or scissors. If cutting on-site, special protective measures must be taken for other materials to prevent unnecessary damage from cutting the geotextile.

The connection of geotextiles must adhere to the following regulations: Under normal circumstances, there should be no horizontal connections on the slope surface (connections must follow the contour of the slope without intersecting it), except for the areas being repaired.

3 If stitched, the stitching thread must be made of material identical to or superior to the geotextile, and must be resistant to chemical and UV radiation. There should be a noticeable color difference between the stitching thread and the geotextile for easy inspection.

 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15736168016