Central drive sludge scraper installation cost_SupplyPro Co., Ltd._Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Du'an Environmental Protection Equipment (Jiangsu) Co., Ltd.

Environmental equipment, pumps, water treatment systems, mechanical accessori...

Consultation Hotline
025-57523831   13813381829

Product Categories

Contact Information
  • Contact person:李经理
  • Telephone:025-57523831
  • 邮件:63572853@qq.com
  • 传真:025-57523831
Home > SupplyPro Co., Ltd. > Central drive sludge scraper installation cost
Central drive sludge scraper installation cost
品牌: Duwan
Voltage:
Impeller speed: 63 RPM
Electric Current: 11.1A
单价: 8888.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 500 Tai
有效期至: 长期有效
最后更新: 2024-11-19 10:29
 
详细Info

Central drive sludge scraper installation cost

Nanjing Center Drive Sludge Scrapper Manufacturer

Centrifugal Sludge Disposal Unit ManualIn污泥处置 sectorCentral Drive Thru Sludge ThickenerCertainlyA crucial product, this is a machine that cleans sediment from river channels, suitable for use in rural sewage treatment plants, waterworks, and large circular sedimentation basins in industrial wastewater treatment facilities, to sweep away sludge settled at the bottom of the pool and remove scum from the surface.

1. The track must be on the edges of a rectangle and be level. The embedded iron should be on the spiral and pressure plate to secure the steel rail, cable, and electrical connector installations. Power up for debugging, and record the machine's operating conditions.

2. Before using the central drive thickened污泥 scraper, carefully read the product manual to understand the equipment's principles and processes. Relevant personnel must undergo systematic training before operation.

3. The central drive thickener should operate for about 8 hours without load. During operation, inspect the track condition of the aspiration circuit, the mud pump assembly, and confirm that there are no errors. Check the installation of the sludge outlet pipe and the sludge pipe.

Technical Specifications

Project

Parameters

Sediment Pump Models

Single-side driven half-bridge

Settling Pond Diameter

φ36 m

Walking Speed

Approximately 2 m/min

Work schedule

Can operate intermittently and also run continuously for 24 hours

Motor Power

Drive motor power

1.5KW

Vacuum pump motor power


Motor protection class/insulation class

 F    IP68  

Power Supply

380V

Transmission Method

Real Flow Electric

Equipment Weight

Approximately 3.5 tons

Purchased component brand

Jiangsu Huibang减速电机

Quantity of equipment

4 units

 

Main Components Material:

Part Name

Material

Work Bridge

Carbon Steel Corrosion Resistance

End Beam

Carbon Steel Corrosion Resistance

Bridge walkway plank

Carbon Steel Corrosion Protection

Centering Swivel Support

304 Stainless Steel

Center Ring

304 Stainless Steel

Sludge Flow Control Valve

304 Stainless Steel

Sediment Trap

304 Stainless Steel

Suction Tube

304 stainless steel

U-shaped siphon tube

304 Stainless Steel

Overflow weir plate

304 Stainless Steel

Scum baffles

304 Stainless Steel

Scum Rake

304 stainless steel

Debris hopper

304 Stainless Steel

Roller wheels

High-tensile nylon

Bolts, nuts, and other fasteners


Installation and Operation Instructions for Suspended Central Drive Sludge Scraper

 1. The top surface of the machine frame must be leveled, with an allowable deviation of 0.50‰. The output shaft of the reducer is connected to the vertical shaft using a spline coupling. The coupling has three pin holes, each equipped with a shear safety pin to act as a torque-cutting mechanism for over-torque protection, ensuring the integrity of the entire machine.

 2. During the trial run, the entire machine must operate under no load for at least 2 hours, with smooth operation and noise levels below 80 dB. Load-bearing trial operation should last for at least 24 hours.

 3. The top-end radial bearing and thrust bearing assembly on the vertical shaft, lubricated with grease, requires good lubrication.

 4. At the bottom of the vertical shaft, above the mud removal hopper, install sliding bearings and nylon bushes, which are lubricated with clean water under pressure. It is mandatory to set up a Dg15 lubricating water pipe, extending from outside the pool to the bottom, buried at the bottom of the pool. The outer surface of the pipe must not be higher than the pool bottom surface. Extend it outside the mud removal hopper and connect it to the pipe joint of the sliding bearing. Introduce normal-pressure clean water to ensure good lubrication before trial operation. During normal operation, it is also necessary to connect the pressure clean water before starting the vehicle to maintain good underwater bearing lubrication.



询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

025-57523831