Renovation Methods for Plastic Running Tracks_News Center Co., Ltd._Renovation Methods for Plastic Running Tracks,Sichuan Open Source Hong High Polymer Material Co., Ltd._Sichuan Open Source Hong High Polymer Material Co., Ltd._Zhongshang 114 Industry Resources Network
Sichuan Open Source Hong High Polymer Material Co., Ltd.

Manufacturing, production, and sales of plastic track materials

Consultation Hotline
18200563288  18200563288
 

Company Information

Location:Sichuan/Deyang

会员级别:数字营销2

身份认证:   

我的勋章:  通过中商114认证 [诚信档案]

Business Card

  • 公司名称Sichuan Open Source Hong High Polymer Material Co., Ltd.
  • 联 系 人周先生 (先生)
  • 公司电话18200563288
  • 手机号码18200563288
  • Company AddressSichuan Province, Deyang City, Zhongjiang County, Xinglong Town
home > News Center Co., Ltd. > Renovation Methods for Plastic Running Tracks
News Center Co., Ltd.
Renovation Methods for Plastic Running Tracks
Publish Time:2024-06-19        View Count:12        Return to List

Resurfacing rubber tracks, mainly for sports facilities such as rubber sports courts, rubber tracks, athletic tracks, artificial grass athletic fields, rubber basketball courts, rubber tennis courts, rubber volleyball courts, rubber badminton courts, indoor rubber courts, school rubber playgrounds, kindergarten printed rubber surfaces, renovation and transformation of old rubber surfaces, artificial grass installation, floor paint, replacement and repair of court fencing, and rubber court lighting facilities.

When do plastic running tracks require resurfacing?

Resurfacing a synthetic track typically occurs under two circumstances: one, when the track has reached its service life and is no longer fit for use, continuing to use it may pose adverse effects on individuals; two, due to improper usage during use, causing external damage, such as heavy pressure, sharp object damage, cigarette butt burning, etc.

Renovation Steps for Plastic Track

Firstly, it is essential to clarify the extent of damage to the塑胶surface. Technicians or construction personnel should enter the site to observe the usage and damage of the塑胶surface. Generally speaking, minor damage only requires the simple resurfacing of the塑胶track, whereas severe damage necessitates repairing the original foundation.

Step two: Site cleaning. To ensure the quality of the plastic surface layer, a thorough cleaning of the base surface is necessary to fully utilize the adhesive force of polyurethane and maintain the even thickness of the plastic surface. Rinse the track surface clean with water, remove sturdy protrusions with a shovel and clean them up; if there are trees or other plants around the track with falling leaves, gently shake them to accelerate the leaf fall and remove them in advance, and try to keep the surroundings free of wind-blown debris.

Then, the entire site was sealed off. It is important to note that some construction workers believed only local repairs were needed and that the entire synthetic track did not have to be isolated. To ensure the effectiveness of the track repair, the entire track should be separated. Warning signs should be hung around the track to prevent unauthorized personnel from entering. Sports facilities requiring protection can be enclosed with tape and colorful banners.

Then, proceed with the surface construction work. Release materials; weigh; add ingredients; mix; discharge, using specialized tools to spread the repair surface; spray the surface, and after the surface cools, mark the lines according to the IAAF standard track and field marking specifications.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18200563288