After the construction of the plastic track is completed, it should be inspected. During the inspection, we should pay attention to the following points:
1. Based on the climate conditions, humidity, temperature, and wind at the construction site, inspect the condition of the site foundation, ensuring that asphalt and concrete foundations are properly cleaned.
2. Inspect for any bubbling on the runway surface, verify that the mixture materials meet current national standards, and ensure environmental friendliness are prerequisites for the runway's long-term use.
Ensure all engineering documents are complete, verify the site is level, and assess the integrity of the site. Only after all checks are completed may departure be made.