What are the operation procedures for the screw press sludge dewatering machine?_News Center Co., Ltd._Shandong Leading Flag Environmental Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Leading Flag Environmental Technology Co., Ltd.

Our main products include screw press sludge dewatering m...

Consultation Hotline
15965921728  18766013729

Product Categories
Home > News Center Co., Ltd. > What are the operation procedures for the screw press sludge dewatering machine?
News Center Co., Ltd.
What are the operation procedures for the screw press sludge dewatering machine?
Publish Time:2022-05-06        View Count:40        Return to List

Our spiral wound sludge dewatering machine products have been well-received by a wide range of users. Do you know the operation procedures for this product? Follow along with the editor as we delve into the details.

1. Prior to starting the screw sludge dewatering machine, check if there are any debris in the mixing tank, if the filter body has emptied the sludge, and if there are any sludge lumps at the head of the spiral shaft.

2. Start-up Steps for the Screw Press Sludge Dewatering Machine: (1) Add flocculant powder to the PAM preparation system and turn on the agitation unit; (2) Manually spray rinse the moving and fixed disk plates on the filter body for 2 minutes; (3) Turn on the main body drive motor, check the rotation direction of the main body drive motor, and continue to spray rinse for another 2 minutes; (4) Sequentially start the flocculant supply pump, sludge feed pump, and flocculant agitation motor; (5) Adjust the sludge feeding amount and screw shaft speed of the screw press sludge dewatering machine, and adjust the spacing of the back pressure plates to optimize the treatment volume and moisture content.

3. After the screw mud dewatering machine is started, check whether the screw shaft rotates normally, whether the mud level in the mixing tank is stable, and whether all rotating parts operate normally, and if there is any abnormal noise.

4. Sludge Dewatering Screw Machine Shutdown Procedure: (1) Turn off the sludge feeding pump to stop the sludge intake; (2) Close the dosing pump and dosing system to halt medication; (3) Empty the flocculation mixing tank and stop the flocculation mixing motor; (4) Wait for all sludge to be drained (minimum of 30 minutes), then manually spray rinse the filter for 5 minutes to clean the equipment; (5) Turn off the power.

Above is our introduction to the screw press sludge dewatering machine. We hope this helps you get a basic understanding of the screw press sludge dewatering machine. For more exciting content, please continue to follow our website's news or contact us for detailed inquiries.


 Click submit means you agree to《Service terms》《Privacy policy》

18766013729