Chizhou 100,000-Class Clean Room - Anhui Mengjingyuan | Design & Construction_SupplyPro Co., Ltd._Anhui Mengjingyuan Environmental Technology Development Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Anhui Mengjingyuan Environmental Technology Development Co., Ltd.

Purification Engineering, Cleanroom, Dust-Free Inserts, Cleanroom, Dust-Free ...

Tianzhu Hui Star Member
Consultation Hotline
13721031023

News Center Co., Ltd.
  • 暂无新闻

Product Categories
Home > SupplyPro Co., Ltd. > Chizhou 100,000-Class Clean Room - Anhui Mengjingyuan | Design & Construction
Chizhou 100,000-Class Clean Room - Anhui Mengjingyuan | Design & Construction
品牌: Anhui Mengjingyuan
Manufacturer:
Is negotiation possible?: Negotiable
Sample Support: Negotiable
单价: 1.00/Piece
最小起订Quantity: 1 Piece
供货总Quantity: 99999 Piece
有效期至: 长期有效
最后更新: 2023-07-26 15:40
 
详细Info






Cleanliness and disinfection of the cleanroom in the purification workshop


Ceiling and walls: Wipe clean with a dust-free towel dampened with pure water, then use a clean, dust-free towel soaked in disinfectant for擦拭.

Cleanroom and other surfaces: Wipe with a clean, dust-free towel moistened with pure water, then wipe with a clean, dust-free towel dipped in disinfectant.

Cleanroom Status Indicator:

The sampling room must have clear status indicators, such as: In Use, Cleaned, and To Be Cleaned. When sampling is in progress, the ISO 7 cleanroom should be marked as "In Use"; after cleaning is completed, it should be marked as "Cleaned"; (cleanroom) when sampling is just finished and needs to be cleaned, it should be marked as "To Be Cleaned."




The construction process for a clean room primarily includes the following points:

Construction Drawing Design: Determine the initial construction process plan of the preliminary purification workshop as the construction drawing design.

Engineering: Construction to be carried out according to the purification workshop construction drawings.

Adjustment and Inspection: Conduct debugging and purification of the workshop construction process and inspection according to acceptance specifications and contract requirements.

Completion and Handover: Conduct final acceptance inspection and deliver to the customer for use.

Maintenance Services: Take responsibility and provide services after the construction warranty period for净化车间. Achieve facilities that operate economically, saving energy, easy to maintain, and cost-effective. When designing the construction of industrial workshops, it is necessary to effectively utilize spaces for production processes, purification air conditioning, and public power facilities, achieving savings in area, reducing energy consumption, and preventing pollution or cross-contamination. Physical purification methods

Activated carbon filters. Activated carbon is a porous carbon material with highly developed pore structures. Its porous structure provides a large surface area, allowing for complete contact with gases (impurities), making activated carbon adsorbent and easily effective in absorbing and collecting impurities. Just like magnetism, all molecules have an attractive force between them.







What to pay attention to when designing a laboratory clean room


Exhaust system issues

The design of the exhaust system should emphasize its rationality. The selection of the exhaust location is a crucial aspect in meeting process requirements. The purpose of the exhaust system design is to scientifically set the exhaust points and effectively reduce the exhaust volume. The primary way to meet the fresh air volume requirements is to add some exhaust air to the system, but this should not be promoted excessively. When the air leakage from the building and ventilation system is sufficiently large, the addition of exhaust air is redundant, so a detailed understanding of this should be included in the design.



Chizhou's 100,000-Class Clean Room - Anhui Mengjingyuan | Designed and constructed by Anhui Mengjingyuan Environmental Technology Development Co., Ltd. Located at Room 921, Tianrun Building, Northeast corner of Furong Road and Jiaoding Road, Economic and Technological Development Zone, Hefei City, Anhui Province. Striving and developing amidst the surge of market economy, Anhui Mengjingyuan has gained a good reputation in engineering construction. Achieving the status of an all-around networked enterprise marks that our service and management have reached a new height. All employees of Anhui Mengjingyuan are willing to work together with individuals of insight from all walks of life to develop and create a better future.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

13721031023