Rainwater and Sewage Diversion Device - Liquid-Operated Downward-Sliding Weir Gate_News Center Co., Ltd._Qingdao Mingyuan Environmental Protection Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

企业资质

Qingdao Mingyuan Environmental Protection Technology Co., Ltd.

Business Model: Manufacturer
Location: Shandong/Qingdao
联系人:李震 (先生)
手机号码:15318738115
Company Address:No. 11, Tonghui Road, Economic and Technological Development Zone, Pingdu City, Qingdao, Shandong Province

Rainwater and Sewage Diversion Device - Liquid-Operated Downward-Sliding Weir Gate

Rainwater and Sewage Diversion Device - Liquid-Operated Downward-Sliding Weir Gate

Rainwater and Sewage Diversion Device - Liquid-Operated Downward-Sliding Weir Gate

2023-11-21

In the water level control system for pre-ditching of drainage pipeline rainwater overflow, through weir gatesRegulating the water level of rainwater inside drainage pipes, but the weir gate structure is complex. For example, the downward-opening weir gate is primarily composed of a weir plate, a weir frame, and an oil cylinder. The weir plate and weir frame are made by bending and welding thin stainless steel plates. Due to the high sealing requirements of the weir gate, on-site assembly is challenging, so the main method is to fully assemble the entire structure in the factory and then install it on-site by crane.

96e6ee74532faf992174037..

      On-site hoisting and positioningAt the moment, due to the main body of the weir frame being made of stainless steel sheet, if the method of pre-burying steel plate and reinforcing bar positioning in the door groove is adopted, that is, during the pouring of the door groove, the steel plate is pre-buried inside. After the weir door is hoisted into the door groove, the weir frame and pre-buried steel plate are welded together with reinforcing bars. This method will damageThe weir frame deformation caused by the weir frame affects the overall seepage prevention of the weir gate.

The primary functions are water retention and flushing.Washing and draining.He can adjust the water storage volume or elevate the level of the drainage pipe.Generate powerful hydraulic waves to scour the sewers.The product can also be used to control the drainage volume of drainage facilities, primarily driven by hydraulic power. The material of the product is:Manufactured with precision using pressure-sealed technology to ensure product quality.


The system primarily consists of weir gates, a hydraulic system (including the oil station and accessories), ultrasonic liquid level gauges, and control systems. To facilitate future maintenance, a maintenance channel is typically provided in front and behind the weir gates.

Ultrasonic level sensors detect water levels on both sides of the weir and convert them into electrical signals for the control system.

The control system drives hydraulic cylinders on both sides of the weir gate, which slide up and down within guiding grooves. Rubber sealing components are fitted on both sides and the bottom of the guiding grooves to ensure sealing (can be three-sided or four-sided sealing).

4

The hydraulic cylinder is equipped with a displacement sensor, allowing for precise control of the weir plate to stop at any position. In the event of a power outage, it can manage various functions such as upstream water level control, flushing, and prevention of backflow.

Yamen Composition:a. Check weir frame b. Guide slot c. Sealing assembly d. Weir plate e. Hydraulic cylinder

ThreeEquipment Application Environment and Composition

0Technical Summary

In the water level control system for drainage pipeline rainwater overflow, the weir gate is used to control the liquid level of rainwater within the drainage pipe, but the weir gate structure is complex. For example, the downward opening weir gate is mainly composed of a weir plate, a weir frame, and an oil cylinder. The weir plate and weir frame are made by bending and welding thin stainless steel plates. Due to the high sealing requirements of the weir gate, on-site assembly is difficult, so the main method is to fully assemble it as an integral unit in the factory and then install it on-site by crane lifting.

During the on-site hoisting alignment, due to the main body of the weir frame being made of stainless steel sheet, using the method of pre-buried steel plate and reinforced steel bar alignment, i.e., embedding the steel plate during the pouring of the door slot, after the weir gate is hoisted into the door slot, welding the weir frame to the pre-buried steel plate with steel bars, this method can damage the weir frame and cause deformation, affecting the overall seepage prevention of the weir gate.

图片1

Qingdao Mingyuan Environmental Protection Technology Co., Ltd.

Inquiry Message
 Click submit means you agree to《Service terms》《Privacy policy》
Contact us
  • 李震 (Mr.)

  • 15318738115

  • 15318738115

  • No. 11, Tonghui Road, Economic and Technological Development Zone, Pingdu City, Qingdao, Shandong Province

www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》