Ten Steps for Tower Crane Installation and Dismantling_News Center Co., Ltd._Ten Steps for Tower Crane Installation and Dismantling,Sichuan Pumeijia Construction Machinery Rental Co., Ltd._Sichuan Pumeijia Construction Machinery Rental Co., Ltd._Zhongshang 114 Industry Resources Network

Sichuan Pumeijia Construction Machinery Rental Co., Ltd.

Construction engineering; Professional construction operations; Special equip...

Service Hotline:
13708118467  13708118467


Company Information

Location:Sichuan/Mianyang

会员级别:采商通3

身份认证:    

我的勋章:  通过中商114认证

Business Card

  • 公司名称Sichuan Pumeijia Construction Machinery Rental Co., Ltd.
  • 联 系 人李映柏 (先生)
  • 公司电话13708118467
  • 手机号码13708118467
  • Company AddressMianyang High-tech Industrial Development Zone, Puming Street, Ningxiang Temple Residential Committee, Team 5, No. 3

Contact Information
  • Contact person:李映柏
  • Telephone:13708118467
  • Mobile:13708118467
Home > News Center Co., Ltd. > Ten Steps for Tower Crane Installation and Dismantling
News Center Co., Ltd.
Ten Steps for Tower Crane Installation and Dismantling
Publish Time:2023-07-24        View Count:11        Return to List

Tower Crane Installation Steps:

First: Site Inspection

Ensure the crane is positioned correctly for lifting.

Two: Basic Section Installation

A detailed level measurement of the foundation is conducted prior to installation, with leveling adjustments made during the foundation section installation process.

Standard Section Installation

Install the appropriate number of standard sections.

Four: Installation Frame

Adjust the spacing between the jacket and standard section to the appropriate position.

Five: Rotating Installation

Six: Installation of the Tower Tip Section

Balancing Arm Installation

Installed a counterweight onto the boom, lifting it with the crane.

Eight: Install the cab

The cab electrician has completed the main circuit wiring of the tower crane, to coordinate with the swing operation of the boom during the installation process.

September: Installation of the crane arm

After installing the crane arm, sequentially place the remaining counterweights on the balancing arm.

Ten: Wearing wire ropes and hooks

Ten: Installation of Standard Sections and Equipment Calibration

According to the specific on-site construction requirements, elevate the tower crane to the appropriate position and proceed with reasonable adjustments.

Tower Crane Demolition Steps:

Cranes are dismantled and installed in the same manner, but the sequence of operations is reversed.

First: Site Survey

A thorough on-site inspection was conducted, clearly identifying the placement of the components to be removed.

Two: Secure rope

Safety strips have been installed in the work area, and dedicated personnel are monitoring and persuading to prevent unauthorized individuals from entering.

Three: Lower Standards for Cost Reduction

After positioning the crane arm properly, adjust the balance and begin lowering sections. Lower 7 standard sections sequentially, retaining the following standard sections for disassembly.

Four: Lower the counterweight block

Gradually lower the counterweights while retaining one to maintain balance.

Five: Demolish the crane boom

The crane is hoisted to the predetermined position by the demolition crew in conjunction with the crane.

Six: Lower the last weight block

Seven: Remove the balancing arm

Follow the procedure for dismantling the crane boom.

Remove the tower cab and rotating platform

Remove the remaining standard sections.

Count the scene.

Counting screw threads, bolts, cables, large hooks, and hydraulic pumps.