Tower Crane Installation Steps:
First: Site Inspection
Ensure the crane is positioned correctly for lifting.
Two: Basic Section Installation
A detailed level measurement of the foundation is conducted prior to installation, with leveling adjustments made during the foundation section installation process.
Standard Section Installation
Install the appropriate number of standard sections.
Four: Installation Frame
Adjust the spacing between the jacket and standard section to the appropriate position.
Five: Rotating Installation
Six: Installation of the Tower Tip Section
Balancing Arm Installation
Installed a counterweight onto the boom, lifting it with the crane.
Eight: Install the cab
The cab electrician has completed the main circuit wiring of the tower crane, to coordinate with the swing operation of the boom during the installation process.
September: Installation of the crane arm
After installing the crane arm, sequentially place the remaining counterweights on the balancing arm.
Ten: Wearing wire ropes and hooks
Ten: Installation of Standard Sections and Equipment Calibration
According to the specific on-site construction requirements, elevate the tower crane to the appropriate position and proceed with reasonable adjustments.
Tower Crane Demolition Steps:
Cranes are dismantled and installed in the same manner, but the sequence of operations is reversed.
First: Site Survey
A thorough on-site inspection was conducted, clearly identifying the placement of the components to be removed.
Two: Secure rope
Safety strips have been installed in the work area, and dedicated personnel are monitoring and persuading to prevent unauthorized individuals from entering.
Three: Lower Standards for Cost Reduction
After positioning the crane arm properly, adjust the balance and begin lowering sections. Lower 7 standard sections sequentially, retaining the following standard sections for disassembly.
Four: Lower the counterweight block
Gradually lower the counterweights while retaining one to maintain balance.
Five: Demolish the crane boom
The crane is hoisted to the predetermined position by the demolition crew in conjunction with the crane.
Six: Lower the last weight block
Seven: Remove the balancing arm
Follow the procedure for dismantling the crane boom.
Remove the tower cab and rotating platform
Remove the remaining standard sections.
Count the scene.
Counting screw threads, bolts, cables, large hooks, and hydraulic pumps.