How to design drilling and formulate a reasonable operational plan is a crucial aspect of using our factory's silent crushing agent, as it directly impacts the crushing effect. Improper design may lead to an extended cracking time or“No Chinese content provided.”Severe consequences even without cracking. Therefore, before using our factory's products, customers...No Chinese content provided.Pre-notify us of its intended use so that our factory can provide you with a more reasonable operational plan for reference. The general method of use is as follows:
1Drilling:
(1Aperture:32-50Mm (The larger the aperture, the greater the expansion pressure generated, and the shorter the cracking time. But as for the environmental temperature in35No Chinese content provided. Please provide the text to be translated.32-40MMOur drill bits reduce the likelihood of fracture jet holes.
(2Spacing between holesL1:10-40Centimeters (The smaller the hole spacing, the shorter the cracking time. Depending on the hole diameter and the material of the object, it is approximately the diameter of the hole.)5-8No Chinese content provided., Granite, limestone, iron ore, and reinforced concrete are approximately the diameter of a hole.5-6We've doubled our production of marble, sandstone, and concrete.7~8No Chinese content provided.
(3Kong Shen:85-105%HPlease clean out any dust or standing water from the hole prior to filling.
(4Please provide the Chinese content to be translated.L2The spacing between the perforations:0.2-3M ( Engineering crushing is generally...0.2-1M, Mining raw material extraction1-3M)Determined specifically according to varying construction requirements and design.
Note: For special applications (such as large apertures)60MM-90MMPlease declare any special engineering requirements in advance so that our factory can provide the corresponding products or assist in designing the operation scheme. When it comes to breaking thick concrete, it can be broken down in layers, with each layer having a single thickness.0.5~1.5mFor special engineering projects, the design can incorporate diagonal holes. For diagonal or horizontal holes, material can be loaded using conduits, or the abrasive can be mixed into a semi-paste, formed into a plug, and inserted into the hole before being tamped.
2Ratio and Dosage:
1Crushing Agent Usage: Approximately1.8Please provide the Chinese content you would like translated into American English./Cubic centimeters, as1MΦ36MMDrilling requirements are approximately1.8Kilograms.
2Water Ratio: Approximately equal to the weight of the crusher25-30%No content provided for translation.10Kilogram Abrasive Agent2.5-3Kilograms of water.
Note: When the ambient temperature is below10Celsius when available40Stir with lukewarm water around 90 degrees.
3Blending, Mixing, and Holes Filling:
Slowly add the pre-mixed abrasive to the water while stirring continuously until it forms a paste-like consistency.(One StirSuggestionNo content provided.10Pounds, for ease of hole installation)Thereafter, the well-mixed slurry was then processed.5Pour into the holes within a minute. Note: Pay attention to the mixing, stirring, and filling times.SuggestionNot exceeding10Minutes, all loading times for drilling operationsSuggestionNot exceeding30To minimize the likelihood of "punching or jetting" after the hole is filled with the breaker, it is recommended to avoid drilling during high temperatures in summer, particularly when the material being broken has a high temperature (suggesting morning filling). For longer "row holes" or deep holes,SuggestionMultiple personnel loading materials simultaneously. When the ambient temperature is below10At the appropriate time, after the holes are drilled, they can be covered with straw mats or other materials to retain heat.