During installation, we strive for a level inner wall, ensuring the pipe is clean with no debris and no excess mortar or the like.
When preparing to install the equipment, we use hanging lines to control the installation axis.
We must also note that all pipe sections should be laid according to the specified slopes shown on the axis and drawings.
During the installation of pipeline sections, we must ensure that manual labor is used in conjunction with excavators, starting from the downstream end to face the joints upstream.
We must ensure that each section's涵管机 is tightly attached to the base, ensuring even distribution of force on the pipe sections.