What are the steps during the trial operation of the strip assembly machine?_News Center Co., Ltd._Dongguan Jihang Electromechanical Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Dongguan Jihang Electromechanical Technology Co., Ltd.

Slitting/Stripping Machines, Lamination Machines, Spooling Machines, Rewindin...

Consultation Hotline
13825714527

Product Categories

Contact Information
  • Contact person:周经理
  • Telephone:13825714527
  • Mobile:13825714527
Home > News Center Co., Ltd. > What are the steps during the trial operation of the strip assembly machine?
News Center Co., Ltd.
What are the steps during the trial operation of the strip assembly machine?
Publish Time:2024-03-20        View Count:23        Return to List

Prior to the trial run, all moving parts must be operated under no-load conditions (both forward and reverse) to check their operational status.

(2) Initiated the main motor for leveling machine's no-load trial operation, running in both directions continuously for 1 to 2 hours, inspecting the connections and operation of all components, as well as the braking effect of the leveling mechanism's brake.

(3) Once deemed operational, the equipment should undergo a load test run. Similarly, inspect all parts of the machine, and in case of any abnormal phenomena, stop the machine immediately for inspection or adjustment. After eliminating the abnormality, resume the test run. The machine should operate smoothly without significant vibration or noise.

(4) After successful trial operation, the machine can be put into production. Prior to the full磨合 of all machine components, the machine's load must not exceed 80% of the rated load.


 Click submit means you agree to《Service terms》《Privacy policy》

13825714527