Type A Dry Mix Lightweight Aggregate Concrete, On-Site Construction Conditions_供应产品_Langfang Chenzhuan Environmental Protection Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Langfang Chenzhuan Environmental Protection Technology Co., Ltd.

Lightweight Aggregate Concrete, Lightweight Aggregate, Manufacturer of Lightw...

Consultation Hotline
13013218960  13012081656

联系方式
  • Contact person:李玉龙
  • Telephone:13013218960
  • Mobile:13012081656

Product Categories
Home > 供应产品 > Type A Dry Mix Lightweight Aggregate Concrete, On-Site Construction Conditions
Type A Dry Mix Lightweight Aggregate Concrete, On-Site Construction Conditions
品牌: Chen Xuan
Origin: Hebei Langfang
Material: Lightweight aggregate concrete
Appearance: Concrete
单价: 100.00/cubic meters
最小起订Quantity: 1 cubic meters
供货总Quantity: 999999 cubic meters
有效期至: 长期有效
最后更新: 2024-08-02 12:11
 
详细Info

Type A Lightweight Aggregate Ready-Mixed Concrete, On-Site Construction Operation Conditions

1. The A-type composite lightweight aggregate concrete base consists of two components: the base powder is made by adding various cementitious materials, fly ash, blending with cement, and mixing with porous rock aggregates. The lightweight aggregate is granular glass beads. The dry apparent density of the A-type composite lightweight aggregate concrete ranges from 350 to 600 kg/m3, with a thermal conductivity less than 0.1 W/m.k, and compressive strength greater than 1.5 Mpa.

  
2. Lightweight Aggregate Lining Powder: Prepare as follows: Mix one bag of lightweight aggregate lining powder (both powdered and blocky packaged) with 1.3 times the weight of water in a low-speed mixer until well blended. Then, add two bags of lightweight aggregates and mix again until uniform. (Note: Do not over-mix during the process, as prolonged mixing will reduce the yield.)

Type A Dry Mixed Lightweight Aggregate Concrete, On-Site Construction Conditions

  
1. Preliminary cleaning required, all wall surfaces should have loose areas chiseled away, and all dirt, loose dust, oil stains, etc., removed. If there are quality issues with the base layer, negotiate with Party A and arrange for personnel to make corrections and repairs before proceeding with construction.

2. The base surface is flat, checked with a long straight ruler, the gap between the ruler and the base should not exceed 5mm.

  3. Pre-buried pipe fittings installed, exhaust holes fitted, manhole treatment completed. Should meet design specifications.

4. Raw materials must undergo a retest (with a sample size of 3KG per batch), in compliance with the specifications of relevant standards.