Project Name: Jiangxi Lihao Group Soundproof Room
Governance Objective: To reduce the interference of external noise from the acoustic chamber on the internal environment, facilitating accurate measurement of experimental noise within the chamber. The overall sound insulation of the acoustic chamber is ≥20dB(A), excluding the influence of non-related factors. After closing the doors and windows, the indoor noise level is lower than the outdoor level by ≥20dB(A).
Engineering Challenge: The soundproof room in this project requires robot access. In accordance with the client's requirements, our company has installed automatic lifting and lowering soundproof doors in a suitable location within the soundproof room, achieving unified work with the client's robots.


