The core cycle for explosion-proof electrical testing is3-year inspectionBased on the national standards AQ 3009-2007 and GB/T 3836 series, inspections must be conducted by institutions with professional qualifications.
Section 1: Explosion-Proof Electrical Equipment Inspection Cycle
Mandatory Testing Requirements:
- Professional Inspection CycleWithin 3 years, in accordance with Clause 5.2.4 of AQ 3009-2007.
- Routine InspectionInitiated independently by the company, the project is completed in less than three years.
2. Special Circumstances:
- High-temperature/corrosive environments require shortened cycles.
- Equipment must be re-inspected after改造.
Section 2: National Standard for Explosion-Proof Electrical Equipment Testing
1. Core Standard System:
- AQ 3009-2007Electrical Explosion Protection Safety Regulations for Hazardous Areas
- Establish specified testing cycles, inspection items, and record-keeping requirements.
- GB/T 3836 Series。
- GB 3836.1-2021: General Requirements for Equipment.
- GB 3836.15-2024: New Electrical Equipment Design Standards Introduced.
- GB 50058-2014Explosive Environment Electrical Equipment Design Standards.
2. Inspection Content:
- Equipment selection and installation standardization.
- Circuit Insulation/Grounding Status.
- Blastproof structural integrity (e.g., blast-proof face clearance).







