How long is the detection cycle for explosion-proof electrical equipment in use? | AQ3009 Regular Explosion-Proof Inspection Agencies_Service Scope Co._Shenzhen ZhongNuo Testing Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Shenzhen ZhongNuo Testing Technology Co., Ltd.

Explosion-proof Certification, Explosion-proof Compliance...

19925395926
 

Product Categories

Contact Information
  • Contact person:谢志光
  • Telephone:19925395926
  • Mobile:19925395926
  • Email:1354407946@qq.com
  • Address:No Chinese content provided.
Home > Service Scope Co. > How long is the detection cycle for explosion-proof electrical equipment in use? | AQ3009 Regular Explosion-Proof Inspection Agencies
How long is the detection cycle for explosion-proof electrical equipment in use? | AQ3009 Regular Explosion-Proof Inspection Agencies
品牌: Shenzhen ZhongNuo Inspection
Inspection Criteria: AQ3009-2007
Testing Scope: A variety of explosion-proof sites
Inspection Cycle: At least an annual inspection every 3 years
单价: 10000.00/Next
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2025-11-10 15:50
 
详细Info

With the increasing popularity of explosion-proof electrical equipment, many hazardous explosive areas have installed and used such equipment. Many end-users believe that once explosion-proof electrical equipment is installed in hazardous explosive areas, everything is settled. However, in many cases, the so-called explosion-proof equipment lacks valid explosion-proof certificates, or the certificates have expired or are counterfeit. The markings do not match the explosion-proof certificates, the explosion-proof type selection is incorrect, gas explosion-proof equipment and dust explosion-proof equipment are mixed, the wiring of explosion-proof equipment installation is improper, the lines are not grounded, holes are drilled or buttons are installed on the explosion-proof enclosure causing it to fail, and the explosion-proof equipment is subjected to long-term corrosion, high temperatures, and intense vibrations.


For explosion-proof electrical equipment in use, the AQ 3009-2007 "Electrical Safety Regulations for Explosion-Proof in Hazardous Areas" standard stipulates:Electrical equipment used in explosion-proof environments should be inspected by a certified explosion-proof testing center at least once every 3 years for performance, installation, and maintenance.Immediate corrective actions must be taken for items that fail inspections, and the inspection report and corrective measures must be filed with the安全生产监督管理部门.


Conducting explosion-proof field inspections on electrical equipment in use is not only a requirement of the safety production department, but also a manifestation of a company's emphasis on its own life and property safety.


Process for Enterprises to Apply for On-site Explosion-Proof Inspection

1. The company provides the area of explosion-proof sites and the quantity of explosion-proof electrical products for us to evaluate and quote.

2. Officially sign the cooperation agreement; the company provides detailed information on explosion-proof sites.

3. For on-site explosion-proof inspections, the following documents must be provided:

(1) Area of explosion-proof site

(2) Explosion Hazard Area Division Map

(3) Names of explosive hazardous substances within the relevant danger zones and their Material Safety Data Sheets (MSDS)

(4) List of explosion-proof electrical products, including installation area and tag number information

(5) Copies of explosion-proof electrical products' explosion-proof certification

(6) Instructions for Special Application Conditions of Explosion-Proof Electrical Equipment

(7) Descriptive Technical Document for Intrinsically Safe System

(8) Installation Quality Documents

4. Engineers conduct on-site inspections of explosion-proof electrical products and provide整改意见 for non-compliant items.

5. The company is to cooperate with the rectification measures within the predetermined period, as per the整改意见.

6. Engineer conducts on-site reassessment; upon qualification, issues on-site inspection report

7. The company provides the final inspection report for filing with the local safety supervision department.

Conducting explosion-proof site inspections on in-use explosion-proof electrical equipment is not only a requirement of the safety production department, but also a testament to the company's emphasis on its own life and property safety.

Service Hotline: 18924609560 (WeChat same number)

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

19925395926