35-220KV Cross-Connection Grounding Box_SupplyPro Co., Ltd._Auszense Lighting (Zhejiang) Co., Ltd.

Company Qualification

Auszense Lighting (Zhejiang) Co., Ltd.

Business Model: Manufacturer, Service Provider
Location: Zhejiang/Wenzhou
Contact person:经理 (先生)
Mobile号码:13819771982
Company Address:Leqing City Liushi Town Fangdouyan Industrial Zone

35-220KV Cross-Connection Grounding Box

SupplyPro Co., Ltd.
  • 35-220KV Cross-Connection Grounding Box

    Hotline:13819771982

    Details Introduction

    I. Product Overview

    Technical requirements for design, manufacturing, and use of cable sheath protection earthing boxes, direct earthing boxes, cross-connection boxes, and sheath insulation monitoring boxes.

    Section 2: Execution Standards

    GB11032-2000、IEC6009-4、DL/T401-2002

    Section 3: Application Scope

    System rated voltage: 10KV

    Cable Nominal Section: 25-800 mm²

    Rated Frequency: 50Hz, 60Hz

    Protective earthing box, direct earthing box, cross-connection box, and sheath insulation monitoring box are for three-phase common body; please specify if single-phase is required.

    Four, Factory Testing (Test Standard JB8144)

    DC High Voltage Test: 5.5KV, 1 min, no flashover, no breakdown.

    2. Rated short-circuit current duration: 4S

    3. Rated Short-Time Current Withstand (Main Circuit) 20KA

    4. Rated Peak Current Tolerance (Main Circuit) 50KA

    5. Rated lightning impulse withstand voltage: 185KV

    6. Shell Endurance to Mechanical Stress Test: Shell is free from cracks and any damage that would affect electrical performance.

    V. Installation Method

    Wall-mounted, underground, bracketed, freestanding, concealed (flush-mounted), etc.

    Section 6: Material Used for the Case

    Stainless Steel 304, SMC Composite, DMC Glass Reinforced Plastic.

    Section 7: Enclosure Operating Environment

    Temperature: -25-40℃

    Altitude: Below 3,000 meters; please specify if above 3,000 meters.

    Protection Grades: IP55, IP56, IP65, IP66, IP68, etc.

    8. Installation Process

    1) Strip the cable insulation to ensure the exposed wire length matches the length of the terminal socket holes.

    2) Clear the items inside the box.

    3) Remove the terminal blocks inside the box, then crimp the stripped and cut ground cable to the terminal blocks, and finally insert the terminal blocks into the box's entry port and secure them with screws.

    4) Secure the first cable before inserting the second cable. Repeat step 3 until all four cables are properly fastened.

    5) Fill in rubber strips between the outlet conduit and the cable, securing the cable in the center of the conduit.

    6) Seal the outlet pipe opening with waterproof tape.

    7) Shrink the heat shrink tubing on the outgoing pipe.

    8) Seal both ends of the heat shrink tube with rubber insulating tape.

    9) Wrap PVC tape over the waterproof strip, partially overlapping to cover two layers.

    10) Clear the items inside the box.

    11) Secure the sealing pad and lid, ensuring not to tighten the screws all at once. Tighten them in three stages, turning each screw three times. Failure to do so may cause the lid to deform.

    12) Simply secure the box to the designated location.

    Auszense Lighting (Zhejiang) Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 经理 (Mr.)

    • 13819771982

    • 13819771982

    • Leqing City Liushi Town Fangdouyan Industrial Zone

    www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》