    Details Introduction

    I. Product Overview

    Technical requirements for design, manufacturing, and use of cable sheath protection earthing boxes, direct earthing boxes, cross-connection boxes, and sheath insulation monitoring boxes.

    II. Execution Standards

    GB11032-2000、IEC6009-4、DL/T401-2002

    Section 3: Application Scope

    System rated voltage: 10KV

    Cable Nominal Cross-Section: 25-800 mm²

    Rated Frequency: 50Hz, 60Hz

    Protective earth box, direct earth box, cross connection box, and sheath insulation monitoring box are for three-phase common body; please specify single-phase if applicable.

    Four, Factory Test (Test Standard JB8144)

    DC withstand voltage test: 5.5KV, 1min, no arc, no breakdown.

    2. Rated short-circuit current duration: 4S

    3. Rated Short-Time Current Withstand (Main Circuit) 20KA

    4. Rated Peak Current Tolerance (Main Circuit) 50KA

    5. Rated lightning impulse withstand voltage: 185KV

    6. Shell withstands mechanical stress test: Shell is free from cracks and has no damage affecting electrical performance.

    V. Installation Method

    Wall-mounted, buried, bracketed, freestanding, concealed (flush-mounted) types, etc.

    Six. Material Used for the Case

    Stainless Steel 304, SMC Composite, DMC Glass Reinforced Plastic.

    Section 7: Enclosure Operating Environment

    Temperature: -25-40℃

    Altitude: Below 3,000 meters; please specify if above 3,000 meters.

    Protection Levels: IP55, IP56, IP65, IP66, IP68, etc.

    Section 8: Installation Process

    Strip the cable insulation to ensure the exposed wire length matches the length of the terminal hole.

    2) Clear items inside the box.

    3) Remove the terminal from inside the box, then crimp the stripped and cut ground cable to the terminal, and insert the terminal into the box's entry port, securing it with screws.

    4) Secure the first cable before threading the second cable. Repeat step 3 until all four cables are firmly in place.

    5) Fill the rubber gasket between the conduit and cable, securing the cable in the middle of the conduit.

    6) Seal the outlet pipe opening with waterproof tape.

    7) Shrink the heat shrink tubing on the outlet pipe.

    8) Seal both ends of the heat shrink tube with rubber-insulated tape.

    9) Cover the waterproof strip with PVC tape, partially overlapping to cover two layers.

    10) Clear the items inside the box.

    11) Secure the sealing pad and lid in place, ensuring not to tighten the screws all at once. Tighten them in three stages, turning each screw three full turns. Failure to do so may cause the lid to deform.

    12) Simply secure the container to the designated location.

    Auszense Lighting (Zhejiang) Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 经理 (Mr.)

    • 13819771982

    • 13819771982

    • Leqing City Liushi Town Fangdouyan Industrial Zone

    www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》