Crack Tape Manufacturer: Application Methods for Crack Tape
Today, let's learn together about the construction method of crack-resistant strips to facilitate a quicker completion during the construction process.
(1) Traffic closure
(2) Ensure thorough cleaning of the construction surface, removing all weeds, oil stains, gravel, and other debris to maintain a clean and dry base, preventing any impact on the bonding between the waterproofing membrane and the existing road surface.
(3) For road sections with surface defects such as roughness, severe loosening, cracks, large protrusions, or depressions, appropriate treatments must be applied to ensure the subgrade has sufficient smoothness and strength.
(4) Site layout for construction is performed based on the paving width to ensure the width and linearity of the paving layer.
(5) Please note the following specific precautions when laying the flooring:
• Alignment is required for splicing, with an effort to minimize gaps or splices exceeding three layers.
The isolation paper should be completely peeled off to prevent any impact on the bonding with the surface.
The paving layer should be fully overlaid on the subgrade, without any exposure.
• Lay the installation from the lower to the higher ground.