Nanjing Steel Structure Factory Inspection Fee_SupplyPro Co., Ltd._Shanghai Tongce Inspection & Testing Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shanghai Tongce Inspection & Testing Technology Co., Ltd.

Engaging in technological development, transfer, consultation, and service in...

Soule Star Diamond Member
Consultation Hotline
400-6899562  18616336280

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Nanjing Steel Structure Factory Inspection Fee
Nanjing Steel Structure Factory Inspection Fee
品牌: Concrete testing
Service Area: Nanjing
Report Date: As per the contract agreement
Industry Type: Structural Steel Factory Inspection
单价: 22.00/square meters
最小起订Quantity: 1000 square meters
供货总Quantity: 9999 square meters
有效期至: 长期有效
最后更新: 2023-02-15 10:10
 
详细Info

Ensure scientific inspection and identification of damage to steel structures post-fire. So, what inspections are required for steel structure components after a fire?

1. Structural Steel Component Appearance Inspection

On-site inspection of the appearance of the main steel structural components, checking for any signs of coating peeling or bending deformation.

2. Component Deformation Measurement

Steel column lateral displacement is measured using a theodolite, while beam deflection is measured with a total station.

3. Component Mechanical Property Testing

Randomly sampled components damaged in the fire were retrieved for laboratory testing of their mechanical properties to determine compliance with the mechanical standards.

4. Structural Calculation and Component Verification

Based on on-site measurements and design drawings, the main structure model of the factory building was constructed, taking into account dead load, live load, wind load, snow load, and seismic load, and it was verified and cross-checked.

5. Authentication and Rating

Based on the structural steel inspection results post-fire, a mechanical analysis of the fire-resistant capacity of steel components was conducted, leading to a specific grading process for the post-fire steel components.

6. Provide key鉴定conclusions, promptly formulate post-disaster response plans for damaged components, repair the main structures in the affected areas, and ensure fire prevention measures during subsequent use.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

18616336280