Raw ore processing capacity: 200-300 tons, less than 6mm processing capacity: 80-100 tons
Gold Mining Equipment Package Process Overview
Raw materials are transported into the feeding chute by engineering vehicles, then flushed into a multi-screw washing drum sieve for sorting into two specifications: coarse and fine materials. After the coarse materials are collected at the end through a fixed gold pan chute, the waste materials are discharged into the waste material pool.
Fine material is discharged into the hopper and then pumped into a desliming machine using a sand pump for desliming. After desliming, the slurry is pumped back into the hopper and further into a 1200# horizontal fully automatic ore centrifuge for concentration. The concentrated material is automatically discharged, while the waste material is automatically pumped into the waste pool.


【200-300 tons full set gold mining equipment technical specifications】


Name

Specs

Quantity

Power

Unit Price

Total Amount

Note

Infeed Chute

3500*5500, Material: 10mm thick steel plate

1 set

-




Screw Sieve

Multiple-joint auger washing drum sieve
1.3m (punched) inner diameter, 1.6m outer diameter, 3m net screen length, includes multiple rabbet blades, double chain drive.
Central and side water supply system

1 set

7.5



Belt Feeder with Support Bracket

Sludge Dewatering Equipment

2000*3800

1 set

4.4



Polyurethane Abrasion-Resistant Screening Mesh

Centrifuge

1200# Horizontal Automatic Ore Discharging Machine

1 set

21.5



PLC Computer Automatic Control

Material Box & Sand Pump

4-inch Sand Pump, 11KW

2 sets

22




Centrifugal Pump


1 unit

5.5




Submersible pump

5.5KW

2 units

11




Distribution Box

Inclusive of motor wires for the equipment, excluding cable wires.

1 set

-




Total Power

71.9KW

Factory Price

200-300 tons processing capacity all-inclusive gold panning equipment, price available upon inquiry

Generator Set


Name

Specification

Quantity

Power

Unit Price

Total Amount

Note

Generator set

150KW Yuchai

1 unit

-

85000

85000


Factory Price

200-300 ton processing capacity complete gold mining equipment, please call for price

【Parts Selection List within Half Year】


Name

Specs

Quantity

Unit Price

Total Price

Note

Sand pump pipeline


15 meters




Centrifugal Pump Pipe


30 meters




Submersible pump piping


60 meters




Jade grass supply


16 meters




Screw Conveyor Screen Mesh

Mesh aperture: 6mm

6 sets




Sifter roller chain


1 set




Diverting valve


6




V-belt

Complete Set

3 sets




4-inch sand pump

Blade impeller

1 piece




Pump Housing

1 piece




Gasket

5




Swivel Connector

Centrifuge

2 pieces




Pneumatic solenoid valve


1 set




Air line


1 disk




Airline Connector


1 box




Generator Set

Triple Filter


2 sets




Pipe Clamp


30 units




Cable wire

502

70 meters




Centrifugal Pump 5.5 kW


1 unit




Submersible pump


1 unit




Total Price

200-300 tons processing capacity complete gold mining equipment, price available upon inquiry

【Equipment Compatibility Selection List】


Name

Specs

Power

Quantity

Unit Price

Total Price

Note

Mercury Mixture Machine

800*1200

3

1 unit




Steel ball



0.3 tons




Gold Separating Shaking Table


1.1

1 unit




Vapor Mercury Apparatus


-

1 unit



Free gift

Mercury Paste Separator


-

1 unit




Melting Furnace

380V 1-4KG

5

1 unit



Internal components are imported from German Siemens

Crucible

2KG

-

10 sets




crucible

4KG

-

10 sets




Gold Bar Molds

100g - 5 pieces
150g - 5 pieces
200g - 5 pieces
665g - 5 pieces
1,000g - 2 pieces

-

22




Melting Furnace Pump



1 unit



10-meter hose included

Total

200-300 ton processing capacity complete gold mining equipment, price upon call