Installation Precautions for Central Air Conditioning System in a 1500 Square Meter Industrial Factory in Suzhou_News Center Co., Ltd._Suzhou Tianxiang Electrical and Mechanical Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Suzhou Tianxiang Electrical and Mechanical Engineering Co., Ltd.

Central Air Conditioning for Factory, Office Building, Commercial Use, Hotel

Consultation Hotline
18552446410

News Category
  • No Category

Contact Information
  • Contact person:顾先生
  • Telephone:18552446410
Home > News Center Co., Ltd. > Installation Precautions for Central Air Conditioning System in a 1500 Square Meter Industrial Factory in Suzhou
News Center Co., Ltd.
Installation Precautions for Central Air Conditioning System in a 1500 Square Meter Industrial Factory in Suzhou
Publish Time:2025-08-07        View Count:2        Return to List

For the Suzhou area, approximatelyA 1,500㎡ industrial factory building requires special attention to the installation of the central air conditioning system to ensure efficient operation, meet process requirements, and reduce long-term operational costs.

 I. Preliminary Planning and Load Calculation

Cool Load Estimation:A 1,500㎡ factory with a height of 6-8 meters would have a cooling load of approximately 180-240 kW (120-160 W/㎡) based on industrial standards, which needs to be adjusted according to the heat generated by equipment, personnel density, and process temperature and humidity requirements.

For areas within the factory with varying temperature and humidity requirements (such as assembly areas, storage areas), it is recommended to use a multi-split system or a water system terminal with independent zoning control.

 Section II: Aircraft Selection and Layout

Chassis Type: Prioritize air-cooled modular chillers or water-cooled screw chillers (if cooling water is available), with the former suitable for Suzhou's low-temperature operating conditions during winter.Above -5°C, it operates; the latter has higher energy efficiency.

Position Requirements:

  Outdoor Unit: Keep away from heat sources (such as boiler rooms), avoid direct sunlight, and reserve≥1-meter maintenance space is required, with multiple units arranged horizontally to prevent heat recirculation.

  Indoor Unit: Utilize side-air delivery method (air outlets positioned on the short side), with a throw distance to cover the entire area, avoiding dead zones; return air should be connected through ducts, and it is prohibited to use the ceiling space directly for return air.

Expansion tank: Located at the highest point of the system, it requires frost protection (due to the damp cold winter in Suzhou, it is recommended to add insulation).

 III. Local Environment Adaptation in Suzhou

Humidity Control: Suzhou's Average Annual Humidity ReachesOver 75% require dehumidification features, such as rotary or refrigerant dehumidification, particularly suitable for precision manufacturing workshops.

Corrosion Protection: For factories near Taihu Lake or chemical zones, outdoor machines must be equipped with stainless steel casings or coated with anti-corrosion paint. After copper tube welding, nitrogen should be filled for protection against oxidation.

 IV. Key Installation and Construction Points

Foundation Reinforcement: The main unit and pump must be installed on a concrete foundation (thickness)≥20cm, with the load-bearing design based on 1.5 times the operating weight of the equipment (including the ice storage system).

Vibration and Noise Reduction:

  - Additional rubber shock absorbers (thickness ≥ 2cm) are installed between the main unit and the base, while the air duct hangers use spring shock absorbers.

  - Strict environmental protection requirements are in place in certain areas of Suzhou (such as the Industrial Park area), with noise levels needing to be controlled at ≤65dB(A) during daytime.

Pipe Construction: Copper Pipe Welding Post24-hour pressure hold leak detection (pressure ≥ 4.0 MPa), condensate drain slope ≥ 1%, to prevent backflow of condensate during the Suzhou rainy season.

 Proposed Solution (Example)

System Configuration:2台风冷模块 units (each with a cooling capacity of 130kW) + 8 jet units (each with a volume flow rate of 6000 m³/h) + a fresh air enthalpy heat exchanger.

Cost Estimation: Equipment+Installation costs approximately 250,000 to 300,000 yuan (inclusive of local labor premium in Suzhou).

Suzhou Tianxiang Electrical and Mechanical Engineering Co., Ltd. has been dedicated to central air conditioning for many years, serving as an all-inclusive solution provider encompassing sales, design, installation, and maintenance.

We are the core agents for world-renowned brands such as Mitsubishi, Daikin, McQuay, Hitachi, Midea, Gree, Haier, and Chigo in central air conditioning, as well as authorized dealers for Carrier, York, Trane, and Tianjia. We offer design, installation, and maintenance services for central air conditioning and ventilation systems in commercial spaces such as villas, clubs, apartments, hotels, hospitals, kindergartens, and office buildings. Over the years, we have maintained a good cooperative relationship with manufacturers, gaining their strong support and ensuring the supply and quality of products.

The company has established a comprehensive service system covering design, sales, installation, and after-sales service, and boasts an experienced and proactive after-sales team.Pursuing the philosophy of "excellent design and refined craftsmanship," we are dedicated to providing customers with comprehensive and timely service in areas such as design, sales, after-sales, and installation. As the company grows, we have gradually expanded our business to surrounding areas of Suzhou, broadening our service coverage while enhancing our corporate reputation. We have established a service network primarily centered in Suzhou with support from neighboring regions, and have forged strong business relationships with numerous domestic and foreign enterprises as well as individual consumer groups, gaining customer recognition and maintaining long-term business collaborations.



 Click submit means you agree to《Service terms》《Privacy policy》

18552446410