A brief introduction to the precautions for the transportation and protection of waste gas purification towers during the installation process_News Center Co., Ltd._Taicang Huayang Anticorrosion Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Taicang Huayang Anticorrosion Equipment Co., Ltd

Specializing in the production of storage tanks, waste gas purification tower...

18550175727
13915776911
 

News Category

Contact Information
  • Contact person:夏经理
  • Telephone:13915776911
  • Mobile:18550175727
  • Address:Taicang City, Shaxi Town, Songnan Village
Home > News Center Co., Ltd. > A brief introduction to the precautions for the transportation and protection of waste gas purification towers during the installation process
News Center Co., Ltd.
A brief introduction to the precautions for the transportation and protection of waste gas purification towers during the installation process
Publish Time:2025-07-08        View Count:17         Return to List

The waste gas purification tower can eliminate the effects of harmful gases from exhaust, featuring a wide range of applications, high purification efficiency, low resistance, and compact equipment footprint. It is a commonly used purification equipment in waste gas treatment projects. The product design is reasonable, utilizing new high-tech packaging to reduce resistance loss, with a large specific surface area, good chemical reactions, and optimal gas-liquid ratio. It boasts high purification efficiency, excellent corrosion and aging resistance, ease of installation and maintenance, etc.


Cautionary Notes for Using the Waste Gas Purification Tower:

1. Regular maintenance, inspection of disk filling, sprinkler pipes, and packaging, as well as cleaning, should be conducted.

2. The exhaust gas purification tower, pump, and fan should be installed on a concrete foundation, and concrete foundations should be constructed as needed.

3. Transportation and installation should be handled with care to avoid damage to the body and parts.

4. During installation and outdoor work, be mindful to prevent frostbite in the lower areas of the reaction pond during winter.

5. When in use, first run the circulation pump for 2-3 minutes, then start the blower. After shutdown, turn off the blower for 1 to 2 minutes before stopping the circulation pump.

6. Regular inspections should be conducted on the pool depth at the bottom of the tower and the degree of waste gas purification, which should exceed the standard. Solutions to replace the bottom absorption pool should be implemented.


 Click submit means you agree to《Service terms》《Privacy policy》

18550175727