The Ying Shang County Traditional Chinese Medicine Branch Office Building Whole Structure Horizontal Moving Project. The building is a frame structure with a floor area of 5,800 square meters. It employs a PLC-controlled hydraulic synchronous shifting system, featuring rolling horizontal movement and dynamic monitoring. The building was moved northward by a total of 40 meters, representing advanced domestic technology in the field of building relocation. Construction period: September 2021 to December 2021. The building has been successfully moved into place.