How to Break the桩头
2025-02-27

Poured pile caps
During the casting of pile foundations, the top elevation of the pile should be 0.5 to 1.0 meters higher than the designed pile top elevation to ensure the concrete strength at the pile head. The portion of the pile head above the designed top elevation must be removed during subsequent construction processes, and this removal of the pile head concrete is referred to as "breaking the pile head."
Piling heads are mainly divided into manual and mechanical methods.
Manual pile driving.
Manual桩头破除
Manual pile driving
2. Mechanical桩 cap breaking.
Why Break the Pile Head?
Grouting piles during concrete pouring often result in cement slurry rising upwards, making it difficult to ensure the strength of the concrete at the pile head.
2. The broken pile reinforcement enters the foundation, serving both as reinforcement for the foundation and integrating the pile with the foundation into a single structure.
The above introduction covers how to break the桩头. If there's anything else you're unclear about, feel free to consult our website. Our professionals will be happy to explain.
王华伟 (Mr.)
18753770336
18753770336
609018831@qq.com
105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound
www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930