National professional pile breaking team, years of construction experience, with construction qualifications_SupplyPro Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Product Center

Company Qualification

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
Contact person:王华伟 (先生)
Mobile号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

National professional pile breaking team, years of construction experience, with construction qualifications

SupplyPro Co., Ltd.
  • National professional pile breaking team, years of construction experience, with construction qualifications

    Hotline:18753770336

    Details Introduction

    New technology for pile head removal - significant advantages

    The advantages of this process: The concrete pile cap and main reinforcement do not bond together, allowing for the quick removal of the pile cap after excavation without the need for stripping钢筋 and concrete, significantly speeding up the pile cap removal process and reducing construction costs.

    (1) Convenience and Speed: Easy to operate, minimal auxiliary equipment, easily accepted by construction personnel, and quickly mastered.

    (2) Economic Efficiency: Reduces equipment and personnel investment, significantly improving the efficiency of pile head destruction, and lowering construction costs.

    (3) Safety and Quality: The pile head reinforcement is protected by a PE sleeve board, making it easy to separate the pile head concrete from the reinforcement during pile head removal, thereby preventing damage to the pile foundation reinforcement and ensuring the quality of the pile foundation reinforcement.

    (4) After breaking, the pile foundation top surface is smooth and aesthetically pleasing.



    Hydraulic pile breakers are powered by hydraulic systems, utilizing the power from excavators or hydraulic stations to break piles. Modularly designed, they efficiently break cast-in-place pile heads.

    Performance Features:

    1. Simple

    Modular structure with simple installation, equipped with different numbers of modules based on pile diameter.

    2. Universal

    The hydraulic pile breaker can be powered by the excavator or by a hydraulic power station.

    3. Eco-friendly

    Full hydraulic drive, low noise, static pressure construction, without affecting the quality of the pile.

    4. Low labor costs

    Primarily operated by a single excavator operator, an additional supervisor can be provided.

    5. Safety

    Construction personnel are excavator operators; they do not directly contact broken piles.

    Jining Shengxin Construction Engineering Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 王华伟 (Mr.)

    • 18753770336

    • 18753770336

    • 609018831@qq.com

    • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

    www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》