Professional Breakaway Stinger Crew_SupplyPro Co., Ltd._Jining Shengxin Construction Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Product Center

Company Qualification

Jining Shengxin Construction Engineering Co., Ltd.

Business Model:
Location: Shandong/Jining
Contact person:王华伟 (先生)
Mobile号码:18753770336
Company Address:105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

Professional Breakaway Stinger Crew

SupplyPro Co., Ltd.
  • Professional Breakaway Stinger Crew

    Hotline:18753770336

    Details Introduction

    New technology for pile head removal - significant advantages

    The advantages of this process: The concrete at the pile head does not bond with the main reinforcement, allowing for a quick removal of the pile head without stripping钢筋 and concrete after the excavation of the foundation pit, significantly speeding up the pile head removal process and reducing construction costs.

    (1) Convenience and speed: Easy to operate, with minimal accessories, construction personnel easily adapt, and can quickly become proficient.

    (2) Economic Efficiency: Reduces equipment and personnel investment, greatly enhancing the efficiency of pile head breaking and lowering construction costs.

    (3) Safety and Quality: The pile head rebar is protected by a PE sleeve board, which allows for easy separation of the pile head concrete from the rebar during pile head breaking, ensuring that the pile foundation rebar remains undamaged and guarantees the quality of the pile foundation rebar.

    (4) The pile foundation top surface is smooth and aesthetically pleasing after removal.



    Hydraulic pile breakers are powered by hydraulic systems, utilizing the power from excavators or hydraulic stations to break piles. They feature modular assembly and are highly efficient in breaking cast-in-place pile heads.

    Performance Features:

    1. Simple

    Modular structure, easy installation, equipped with different numbers of modules according to pile diameter.

    2. General

    Hydraulic pile breakers can be powered by excavators or by hydraulic power units.

    3. Eco-friendly

    Fully hydraulic drive, low noise, static pressure construction, without affecting pile quality.

    4. Low labor costs

    Primarily operated by a single excavator driver, an additional supervisor can be provided.

    5. Safety

    Construction personnel are excavator operators; they do not directly contact broken piles.

    Jining Shengxin Construction Engineering Co., Ltd.

    Inquiry Message
     Click submit means you agree to《Service terms》《Privacy policy》
    Contact us
    • 王华伟 (Mr.)

    • 18753770336

    • 18753770336

    • 609018831@qq.com

    • 105 National Highway & Rencheng Avenue intersection, 80 meters west along the north road, West Building, Room 12, Yongfeng Logistics Compound

    www.114global.com © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

     Click submit means you agree to《Service terms》《Privacy policy》