Firstly, it is essential to inspect the transportation vehicles to prevent malfunctions during transit, as this can lead to accidents.
2. During the process of hoisting cement pipes, no unauthorized personnel should be present on the site. After loading, ensure the cement pipes from Jilin are securely fastened to prevent them from falling off during transportation. Upon arrival at the destination, the unloading process should be conducted in an orderly manner, and the stacks should not be too high.
3. During the transportation of cement pipes, it is recommended to load pipes of the same specification and model into each truck as much as possible.
4. Storage of concrete pipes should be conducted according to the "first in, first out" principle. Concrete pipes should not be stored for an extended period, as they are prone to becoming damp or solidifying.




