If all piping installations/exposure are in environments where pipelines may freeze, thermal insulation data and electrically heated tracing must be provided to prevent pipe damage and affect system operation: all seismic supports should be securely connected to the main structure; when pipelines pass through building settlement joints, the influence of uneven settlement should be considered; and for mechanical and electrical engineering designs outside of buildings with seismic supports, seismic calculations are not required.
If two opposing rigid seismic brackets are positioned at the same location, the suspended screws can be omitted. During the optimization of the integrated pipeline system, the seismic brackets have established a set of avoidance principles that can be followed by all parties: all professional pipelines installed on the integrated support and suspension brackets adhere to the general principle of "small pipes control large pipes, pressure pipes control non-pressure pipes, weak electric control strong electric, flexible pipes control non-flexible pipes, and pipes that do not require frequent maintenance should be controlled by those that do require frequent maintenance." This means that when the pipelines are laid out in parallel, the electrical equipment pipelines are located at the top, the ventilation and air conditioning ducts are in the middle layer, and all water pipelines are at the bottom.
Semi-Automatic: Tapping will toggle between semi-automatic and full-automatic modes. In full-automatic mode, a green闪烁 and "Full Automatic" text will indicate this. In semi-automatic mode, after loading the material, the external "Start" button must be pressed to confirm the operation. In full-automatic mode, the current pipe component processing will automatically begin once the set material loading time has elapsed.
The placement of fixed points becomes fixed supports, eliminating relative displacement between pipe supports.
Pipe ends should be equipped with horizontal seismic supports. For steel pipes with a diameter of 200mm or more, a secondary hot galvanizing should be applied after installation. All pipelines crossing the expansion joints of buildings should be connected with metal bellows expansion joints. If all pipelines are installed/exposed in an environment where the pipeline system may freeze, provide insulation materials and electrically heated tracing to prevent pipeline damage and affect system operation.
When pipe conflicts occur, it's essential to protect homes, address interference and collision issues with various professional pipes, and coordinate conflicts involving air ducts, water pipes, cable bridging, fire protection, drainage and supply pipes, communication, and signal bridging.