Establishing the installation platform—Positioning the base, installing the guide rails, assembling the horizontal truss components—Bolt the beams to the guide rails, attach the main frame uprights to the beams—Attach the diagonal rods to the uprights and beams—After installing the wall guide device, unload the frame onto the guide seat—Assemble the elevated frame, construct scaffolding, lay intermediate layers or temporary scaffold planks—Perform temporary frame connections with the building structure, hang external dense-mesh safety nets—After installing three beams, mount the lifting seat and the upper wall guide seat—Elevate the main frame uprights, construct the frame to the designed height, lay the top scaffold planks and toe boards—Lay the bottom safety net and scaffold planks, make flip plates—Effectively connect the upper frame to the structure (connection spacing not exceeding 6m)—Hang external dense-mesh safety nets to the top of the frame—Insert the fall arrest hooks into the base fall arrest device, install the lifting wire ropes—Position the electrical control cabinet, distribute the cables, install the electric hoist, wire, and debug the electrical system—Pre-tension the electric hoist, inspect and accept, remove the upper frame and structure connections, synchronize the lifting of one level—All installations completed, enter the lifting cycle
News Center Co., Ltd.