Safety Precautions for Support Beam Cutting Construction_News Center Co., Ltd._Neimenggu Mingjian Special Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》

Neimenggu Mingjian Special Engineering Co., Ltd.

Demolition construction; Bridge engineering; Municipal engineering; Interior ...

13848194356
13451327232
 

News Category
  • No Category
Home > News Center Co., Ltd. > Safety Precautions for Support Beam Cutting Construction
News Center Co., Ltd.
Safety Precautions for Support Beam Cutting Construction
Publish Time:2023-06-21        View Count:26         Return to List

Crushed

Drills are primarily scheduled flexibly based on the actual conditions of the work face.Inner MongoliaConcreteCuttingTo protect the structural rebars during the crushing process, effective crushing methods should be adopted based on local conditions. Isolation zones should be set up within 5 meters of the crushing area to ensure construction safety. After the concrete is primarily crushed, the area can be accessed for separation, reinforcement, and cleaning.

Rebar and concrete separation

Oxygen and acetylene gas cutting is used to separate all the rebars from the supports and joists. When some broken concrete blocks are too large, the air compressor can separate the rebars from the concrete through secondary crushing on-site. The separated rebars should be promptly cleaned and manually stacked in the foundation pit, with sections lifted out. The rebars are transported out after a short period of on-site storage.


内蒙古混凝土切割


When dealing with concrete waste...

After the steel bars are separated, the concrete waste and small forklifts manually clear the accumulation beneath the foundation pit. Net bags and lifting equipment are used for vertical transportation of the bottom plate or ground near the edge of the foundation pit. During the lifting process, ensure the safety of the construction area of the lifting equipment, and remove the construction waste from the foundation pit.

4. Product Protection

We strictly control the size of the concrete破碎 particles supported, with a general particle size not exceeding 300mm. Steel pipes are set on the support plates to form a grid isolation, preventing large concrete masonry blocks from falling into the gaps between the trench and the basement walls.

Thoroughly clean up the foundation pit after breaking, providing a working surface for the construction of the supporting beam cutting structure.