Building Load Capacity Inspection_SupplyPro Co., Ltd._Aupu Construction Quality Inspection 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Aupu Construction Quality Inspection

Inspection and Testing Services; Water Conservancy Project Quality Inspection...

18202997639

Building Load Capacity Inspection

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shaanxi/Xi'an
有效期至:
长期有效
最后更新:
2024-10-08 13:42
Product Details

Brand:

Service Scope:

National

Certificate:

Comprehensive

Date of report issuance:

48 hours

Price:

Transparent

Qualification:

CMA

Structural components for on-site load tests should be symbolic and ideally located at positions with significant loading and where there is a lack of support. On-site loading methods: Generally, uniform loading is adopted; for large and medium-sized complex steel frame structures, centralized lifting can be used. For small and medium-sized components, a design of specialized axial force equipment can be made based on the principle of self-balancing, and hydraulic jacks can be utilized for centralized loading.

Uniform load is generally applied using load blocks, which should be stacked in heaps by section. The immediate gaps between heaps should not be less than 50 millimeters to prevent arching effects.

For prefabricated beams and slabs in assembled structures, if the continuity caused by the cast-in-situ overall surface layer is not considered, the cast-in-situ overall surface layer at the joints, board ends, or beam ends can be cut open, and tests can be conducted on individual components. The tests should be loaded in grades, with each grade not exceeding 20% of the maximum test load.

II. Data Collection and Condition Observation

After each loading and unloading stage, the test should be continuously monitored for 10 to 15 minutes; under higher test load conditions, for 30 minutes. During the delay period, observe the reaction of the test components. Record all readings upon completion. Deflection of the components can be observed using an internal diameter gauge, angular displacement sensor, level gauge, etc. When using an equivalent circuit to simulate uniformly distributed loads, the average deflection error should be multiplied by the correction factor. For a three-point loading, the correction factor is 0.98. For other methods of concentrated loading, the correction factor should be calculated accurately. Stress detection of steel frame components can be conducted using a ground stress magnetometer or a resistive strain gauge.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18202997639

Back to Top