Shenzhen Yonggang Wholesale - Accepts Large Domestic Orders - Delivery to Your Door_SupplyPro Co., Ltd._Shenzhen Bao'an Shajing Shaxing Rubber Tube Shop 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Consultation Hotline
13670011089

News Center Co., Ltd.
  • No News

Product Categories
  • No Category

Contact Information
  • Contact person:许先生
  • Telephone:13670011089
  • 邮件:1031596543@qq.com
  • Mobile:13670011089

Home > SupplyPro Co., Ltd. > Shenzhen Yonggang Wholesale - Accepts Large Domestic Orders - Delivery to Your Door
Shenzhen Yonggang Wholesale - Accepts Large Domestic Orders - Delivery to Your Door
品牌: Shaxing
Application Range: Construction Industry
Material: Plastic
Logistics Transportation: Freight
单价: 1.00/Rice
最小起订Quantity: 1 Rice
供货总Quantity: 10000 Rice
有效期至: 长期有效
最后更新: 2024-07-27 15:08
 
详细Info

Shenzhen Liushu Plastic Pipe Wholesale Center, since its establishment, has always adhered to the service tenet of "unity, pragmatism, innovation, and credibility." With professional services and years of diligent efforts, it has grown into a trading company specializing in selling various piping materials, insulation electrical conduit, and accessories. The company upholds the business philosophy of "customer first, strive for excellence" and sticks to the principle of "customer-centric" to provide comprehensive services to customers. Welcome to visit!

2022/5/24 15:49:17
Important Notes for YongGao PPR Pipe Materials:
1. PPR piping and fittings utilize hot melt connections, but cannot be threaded directly onto piping and fittings.法兰 connections are suitable for metal pipe connections, while metal inserts must be used in fittings for water appliance connections.
2. Always use a reliable hot melt equipment during the hot melt connection process, as it ensures welding quality.
3. When using scissors to cut PPR pipe materials vertically, ensure the cut is smooth and free of burrs.
4. Ensure the welding areas of PPR pipes and fittings are clean to prevent sand and dust from damaging the quality of the joints.
5. During welding, the equipment must heat the pipe and fittings inserted according to the specified time.

6. Once the heating is complete, immediately remove the pipes and fittings for connection. If you find that these two positions are incorrect, you can make the corresponding adjustments within a certain time frame.

2022/5/24 15:49:17

7. After the PPR pipe connection is complete, the pipe and fittings must be tightly held with both hands to ensure adequate cooling time. Once cooled sufficiently, release and continue with the pipeline installation. After connection, mark the location of the white PPR pipe on the wall or floor with colored paint to prevent future damage to the fittings.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13670011089