About the Double Girder Assembly Method_News Center Co., Ltd._Tangshan Yongsheng Hardware Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Tangshan Yongsheng Hardware Co., Ltd.

Our main products include square column clips, beam clamps, shear walls, doub...

18633441617
  
Product Classification Co., Ltd.
  • No Category

Contact Information
  • Contact person:王总
  • Telephone:18633441617
  • Mobile:18633441617
Home > News Center Co., Ltd. > About the Double Girder Assembly Method
News Center Co., Ltd.
About the Double Girder Assembly Method
Publish Time:2023-11-27        View Count:291         Return to List

The double beam supports play a role in transferring loads while also enhancing the tensile force between the beams, ensuring effective load transfer and a certain level of safety. The double beam replacement technique primarily utilizes reinforced concrete double beam supports to transfer the upper loads to the lower structure, thereby reinforcing the existing structure. Below, we share the assembly method for double beam supports.

Place a board on the platform, thread a bolt through its bottom hole, and then install the sleeve onto the end of the bolt that has passed through.

Align the through-holes on two plates with the bolts and secure them to the bolts. At this point, the staff have firmly installed both plates and the sleeve.

Install the nut at the top of the bolt and tighten it using an electric wrench to complete the double beam assembly.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18633441617

Back to Top