Integrated prefabricated pump station_SupplyPro Co., Ltd._Beijing Yibo Yuanquan Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Yibo Yuanquan Technology Co., Ltd.

Integrated precast pumping stations, mobile pumping trucks, permanent magnet ...

Consultation Hotline
13801295289

Product Categories
Home > SupplyPro Co., Ltd. > Integrated prefabricated pump station
Integrated prefabricated pump station
品牌: YiBo Spring Source
Region: Beijing
Item Number: 01
Quality: Authentic (accepts quality disputes)
单价: 10000.00/Piece
最小起订Quantity: 1 Piece
供货总Quantity: 1000000 Piece
有效期至: 长期有效
最后更新: 2022-03-22 11:00
 
详细Info


Integrated precast pump stations feature excellent pressure and buoyancy resistance, can be installed underground, and do not require any buildings on the ground, thus not obstructing green landscapes. They can be placed in various locations such as roads, green areas, gardens, parking lots, and public squares.

This product is widely used in municipal road projects, public buildings, and modern towns, including applications such as stormwater drainage, urban underground立交drainage, collection and discharge of residential wastewater, urban river water regulation, and improvement of river outlet pollution control.

Transmission Medium: Rainwater, Sewage, Industrial Wastewater, etc.

Applicable Industries: Construction Engineering, Chemical Industry, Rural Reconstruction, Municipal Pipeline Reconstruction, etc.

Applicable occasions: schools, hotels, inns, new rural areas, construction projects, residential communities, villas, etc.

Integrated precast pump station features:

1. Compact in size yet boasts a large effective volume.

2. The cylinder structure is made of fiber-wound fiberglass, ensuring even thickness, meeting design requirements, and maintaining stable, excellent quality.

3. Features include strong corrosion resistance, excellent toughness, leakage resistance, and a long service life.

4. On-site work includes excavation, hoisting, pipeline connection, backfill compaction, control cabinet installation, adjustment, and operation. The entire installation process can be completed in 2-3 days.

5. Enhanced and improved the bottom structure, addressing sludge sedimentation issues, thereby tackling polluted gas and water contamination problems.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13801295289