Babjehec Ak苏 Gas Boiler Natural Gas Boiler Pricing
Gas Boiler Maintenance
1. During operation, pay attention to the following points for gas boilers: (1) Gas boilers are not allowed to burn at positive pressure or have smoke in the furnace chamber, as it can easily damage the coal addition cover; (2) No water should accumulate on the horizontal surface at the bottom of the gas boiler to prevent damp corrosion.
2. The gas boiler should be inspected every 2-3 weeks during operation.
3. Gas boiler operation should be shut down for a comprehensive inspection and maintenance every 3-6 months: (1) Conduct an internal and external inspection of the gas boiler, checking for any signs of corrosion on the welds of the pressurized parts and the inner and outer surfaces of the steel plates. If serious defects are found, they should be repaired immediately; if the defects are not severe, they can be repaired during the next shutdown. If any suspicious areas are discovered that do not affect safe production, a record should be made for future reference; (2) After the inspection is complete, apply boiler bottom paint to the water line to prevent corrosion.
4. Gas boilers and boiler bases should be painted at least once a year.
5. Maintenance for gas boilers not in use for a long period: There are two methods, dry and wet. For a boiler not used for over a month, dry maintenance should be employed. For a boiler not used for less than a month, wet maintenance can be used.
(1) Dry Maintenance Method: After the boiler is shut down, drain the boiler water, thoroughly clean the internal dirt, and rinse it clean. Dry the furnace with a low flame (be cautious not to use high heat). Then, place blocks of unslaked lime (10-30mm in diameter) in separate trays inside the boiler drum, ensuring they do not touch the metal. The weight of the unslaked lime should be calculated at 8 kg per cubic meter of drum volume. Close all manholes, handholes, and pipeline valves. Check every three months; if the unslaked lime is in a crumbly state, it should be replaced immediately. When the boiler restarts, remove the lime and trays.
(2) Wet Storage Method: After the boiler is shut down, drain the boiler water, thoroughly clean the internal dirt, flush it clean, then refill it with treated water to the full capacity. Heat the boiler water to 100℃, allowing the gases to escape outside the boiler. Afterward, close all valves. This method should not be used in cold climates to prevent the boiler water from freezing and damaging the boiler.

After-sales service
Please proceed with the Chinese content for translation.“He锅”During the purchase of a boiler brand, you can enjoy our company's high-quality product services, in order to make“Hekou Pot”Brand boilers can be used reasonably, correctly, and in accordance with regulations, and to avoid damage or shortening the service life of the product boiler caused by non-professionals performing maintenance on it. Our company makes the following commitments to the product service:
1. Our company can handle all matters related to boiler design and installation according to your organization's requirements. We offer turnkey projects and provide comprehensive after-sales service, guiding on how to use and maintain the boiler and its accessories, enhancing operational efficiency, and maximizing the lifespan of the equipment.
2. Our after-sales service center is equipped with after-sales service software. We establish corresponding management files for each boiler, track and manage after-sales services for every boiler dispatched, and our service staff conduct regular follow-ups on the boilers. The status of each boiler is then reported back to the after-sales service center, where it is compiled and analyzed. The center provides guidance accordingly. Based on the equipment files established for our customers, we regularly remind them of parts that should be inspected and also provide maintenance personnel according to customer requests.
3. In case of emergencies, our company offers 24/7 service and rapid resolution. Depending on the region, we can be on-site within 1-12 hours, resolve issues within 12 hours within the province, and within 24 hours for issues outside the province.(48 hours in remote areas)If the issue is not resolved, our company is willing to bear all economic losses.
4. Our products are insured for quality by the People's Insurance Company of China.
5. In addition to the quotes, we offer free services for the boiler room equipment and handle all necessary procedures for boiler operations.
6. The company offers free training for boiler operators and technical services, and can provide installation process design drawings for the boiler room.
7. Free replacement of parts with quality issues within the warranty period; our company is responsible for free repairs, replacing damaged components. After the warranty period or due to human damage, we still provide equipment repair and guidance. We only charge cost for repaired or replaced parts, and offer lifetime maintenance after the warranty expires.
8. Regularly conduct phone follow-ups to guide daily maintenance of the boiler based on the boiler service management records, ensuring the boiler operates normally and maintains optimal performance.
9. During the engineering installation process, both parties will cooperate and strictly manage to ensure a high-quality model project. Truly achieve "buy a brand, buy satisfaction, buy peace of mind," adding luster to your esteemed organization.
Choose He Gu, choose success!!!
Design, manufacture, installation, acceptance, construction, training, and comprehensive one-stop service are all provided to ensure the boiler operates smoothly.