Zigong 50-ton gas boiler_SupplyPro Co., Ltd._Shandong Zhongjie Special Equipment Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Zhongjie Special Equipment Co., Ltd.

Zhongjie Special Tank Co. specializes in the installation services of LNG tan...

Consultation Hotline
15253010956  18769007684

News Center Co., Ltd.

Product Categories
  • No Category

Contact Information
  • Contact person:于秋波
  • Telephone:15253010956
  • 邮件:931369632@qq.com
  • Mobile:18769007684

Home > SupplyPro Co., Ltd. > Zigong 50-ton gas boiler
Zigong 50-ton gas boiler
品牌: Zhong Jie
Brand: He Cook
Condition (new/used): Brand New
Location of Equipment: Heze
单价: 10000.00/Tai
最小起订Quantity: 1 Tai
供货总Quantity: 9999 Tai
有效期至: 长期有效
最后更新: 2025-06-19 08:16
 
详细Info

Shandong Zhongjie Special Equipment (formerly Heze Boiler Factory Co., Ltd.) holds an A-grade boiler manufacturing license, an A2-grade pressure vessel manufacturing license, an A2-grade pressure vessel design license, a B-grade boiler installation license, and GB2/Class and GC2/Class pressure pipeline installation licenses, as well as a mechanical and electrical equipment installation contracting qualification. It is a member of the China Boiler and Water Treatment Association, the China Chemical Equipment Association, and the Council Member of the Shandong Equipment Manufacturing Association. The company has also passed the ISO9001 Quality Management System, ISO14001 Environmental Management System, OHSAS18001 Occupational Health and Safety Management System certifications, and the American ASME/U2 certification.
The gas steam boiler's annual gas consumption for a 1-ton unit depends on various factors, including the efficiency of the boiler, load conditions, and operating hours. Generally, it can be estimated using the following formula: Gas Consumption (m) = Boiler Efficiency × Rated Thermal Power × Operating Hours. Here, boiler efficiency refers to the boiler's thermal energy utilization efficiency, typically expressed as a percentage; rated thermal power is the boiler's rated thermal output, usually in kilowatts (kW); and operating hours are the time the boiler is in operation, usually measured in hours. It's important to note that the boiler's efficiency and rated thermal power can be determined based on the specific model and parameters of the boiler, while operating hours need to be estimated based on actual usage. Therefore, to accurately calculate the annual gas consumption of a 1-ton gas steam boiler, it is recommended to refer to the technical specifications and operating records of the boiler, or consult the boiler manufacturer or engineer.
自贡50吨燃气锅炉
Before ignition, the preparation of a steam boiler involves the following steps: 1. Clean the boiler: First, clean the internal and external dirt and impurities from the boiler. Remove ash, sediments, and dirt to ensure the efficiency of combustion and heat exchange. 2. Check fuel supply: Inspect the fuel supply system to ensure a smooth fuel supply. Check the fuel storage tank, conveyance pipelines, and filters, clearing blockages and replacing damaged parts. 3. Inspect the burner: Check the operational status and cleanliness of the burner. Clean the burner's nozzle and flame detector to ensure proper functioning. 4. Check the gas system: If it's a gas boiler, inspect the gas supply system. Check the gas pipelines, valves, and pressure regulators to ensure safe and stable gas supply. 5. Check water level and pressure: Inspect the boiler's water level and pressure. Ensure the water level is within the normal range, and the pressure is stable and meets requirements. Add water and adjust pressure if necessary. 6. Check safety devices: Inspect the boiler's safety devices, such as safety valves, pressure switches, and water level controllers. Ensure these devices are functioning properly to guarantee safe boiler operation. 7. Prepare ignition tools: Prepare the tools and equipment needed for ignition, such as matchsticks, igniters, etc. Ensure these tools are in good working order and safe. 8. While performing the above preparation tasks, follow relevant operational procedures and safety requirements to ensure the safety and effectiveness of the work. If unsure about the preparation process, consult with experts or the boiler manufacturer for advice.
自贡50吨燃气锅炉
Fuel and gas boiler combustion safety and explosion prevention are crucial. Here are some related safety measures: 1. Burner selection and adjustment: Choose burners that meet standards and specifications, and ensure they are installed correctly. The burner's parameters and adjustments should comply with design requirements to ensure stable and safe combustion. 2. Fuel supply system: The fuel supply system of fuel and gas boilers should possess safe and reliable characteristics. Equipment such as fuel storage tanks, transmission pipelines, and filters should be regularly inspected and maintained to prevent leaks and blockages. 3. Combustion control system: The combustion control system of fuel and gas boilers should have the ability to control. The control system should be able to monitor and adjust combustion parameters, such as fuel supply quantity and combustion air volume, to ensure stable and safe combustion. 4. Safety valves and pressure switches: Safety valves and pressure switches should be installed on fuel and gas boilers to protect their safe operation. Safety valves can automatically open when exceeding the set pressure, releasing over-pressured gas or steam to prevent boiler explosions. 5. Gas leak detection: For gas boilers, gas leak detection devices should be installed. These devices can detect gas leaks in a timely manner and trigger alarms to prevent gas accumulation and explosions. 6. Regular inspections and maintenance: Regularly inspect and maintain fuel and gas boilers, including cleaning burners, checking the combustion system, and adjusting combustion parameters. Promptly repair and replace damaged parts to ensure the normal operation and safety performance of the equipment. 7. Training and operational procedures: Train operators to...
自贡50吨燃气锅炉
The management system for gas heat-conducting oil furnace equipment mainly includes the following aspects: 1. Equipment Safety Management System: Establish and improve the safety management system for gas heat-conducting oil furnace equipment, clarify responsibilities and authorities, and ensure the safe operation of the equipment. This includes safety operation procedures, emergency response plans, equipment inspection and maintenance schedules, etc. 2. Equipment Maintenance Management System: Establish an equipment maintenance management system, clarify maintenance responsibilities and plans. This includes regular equipment inspections, maintenance, and repairs to ensure the normal operation and safety of the equipment. 3. Equipment Operation Management System: Establish an equipment operation management system, clarify operation procedures and requirements. This includes start-up, shutdown, adjustment, and monitoring processes to ensure the safety and operation of the equipment. 4. Equipment Accident Management System: Establish an equipment accident management system, clarify reporting, investigation, and handling procedures for accidents. This includes reporting requirements for equipment accidents, responsibility追究, cause analysis, and improvement measures to reduce accidents and minimize losses. 5. Equipment Training and Assessment System: Establish an equipment training and assessment system to ensure operators possess the necessary skills and knowledge. This includes equipment operation training, safety training, and technical training, as well as regular assessments and evaluations of operators. 6. Equipment Record and Management System: Establish an equipment record and management system to document equipment operation, maintenance records, and accident records. This includes equipment record management, maintenance record completion and preservation, and accident record organization and analysis for equipment management and issue traceability. The above are some basic contents of the management system for gas heat-conducting oil furnace equipment incidents. Specific management systems should be formulated and improved based on actual conditions. At the same time, relevant laws and regulations and standards must be followed to ensure the safety and environmental performance of the equipment.
Our company attaches great importance to technological innovation and research and development. We have one municipal enterprise technology center in Heze City, with testing facilities for non-destructive testing, physical and chemical tests, welding tests, hydrostatic tests, and more. Equipped with over 600 pieces of various equipment including CNC machine tools, X-ray flaw detectors, digital ultrasonic flaw detectors, mechanical property test machines, chemical analyzers, spectrometers, tensile test machines, plasma welding machines, and more, our R&D focuses on key products like temperature and pressure vessel welding, biomass boiler emissions reduction, and waste heat utilization. These technologies have successively been selected for multiple Shandong Provincial Department of Industry and Information Technology scientific and technological innovation projects, key provincial projects, and Heze City innovation and excellence projects. We have累计 obtained 27 authorized utility models, 16 authorized inventions, participated in drafting 2 standards, 2 industry standards, and registered 15 trademarks. Our technical team, in collaboration with Professor Yajiang Li from Shandong University, has developed deep cryogenic vessel processing technology using the international plasma arc + filler wire argon arc welding (PAW-GTAW) technique. This technology has been appraised as reaching international standards in the field of deep cryogenic vessel manufacturing at the provincial level.
Choose ZJET customized solutions, let's create brilliance together!

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

18769007684