March 20th
In a Zhejiang-based factory, the 4+1-story telescopic cantilever racking has been installed, debugged, and delivered for use.
The shelves feature a manually operated telescopic cantilever structure, facilitating crane operations for steel lifting and placement. This not only increases inventory capacity but also allows for the classification and layered storage of steel, making both counting and retrieval quick and convenient.
6-meter-long steel pipes, bars, long shafts, channel steels, and other steel materials can be stored on racks, improving the chaotic on-site stacking situation.











