Pile Head Cutting, Pile Head Crushing, Pile Head Cutting Company, Professional Pile Head Breaking Team_SupplyPro Co., Ltd._Beijing Zhongguang Shengda Engineering Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Beijing Zhongguang Shengda Engineering Technology Co., Ltd.

Rope Saw Cutting, Concrete Cutting, Floor Cutting and Demolition, Engineering...

Consultation Hotline
15201060490

News Center Co., Ltd.
  • No News

Product Categories

Contact Information
  • Contact person:刘经理
  • Telephone:15201060490
  • Mobile:15201060490
Home > SupplyPro Co., Ltd. > Pile Head Cutting, Pile Head Crushing, Pile Head Cutting Company, Professional Pile Head Breaking Team
Pile Head Cutting, Pile Head Crushing, Pile Head Cutting Company, Professional Pile Head Breaking Team
品牌: Zhongguang Shengda
Construction Method: Cutting, Drilling, Demolition
Quotation Method: Call for Quotation
Construction Period: Combine site assessment
单价: 100.00/square meters
最小起订Quantity: 1 square meters
供货总Quantity: 100 square meters
有效期至: 长期有效
最后更新: 2024-02-21 15:43
 
详细Info

Coring pile heads is a special process in the construction of pipe piles on a construction site. It is specifically due to the pile head elevation being higher than the design elevation on the construction drawings, and during actual construction operations, the pile head section needs to be cut off. Our produced pile coring machine is specifically developed and produced for this operation. When coring pile heads, certain specifications and requirements must be followed, such as marking the pile head elevation and the coring elevation before proceeding with the construction, and ensuring the quality of the pipe pile after coring.

Purpose of broken pile head: 1. During the concrete pouring process, the cement slurry rises, making it difficult to ensure the pile head strength; 2. The main reinforcement in the pile is used as reinforcement for the pier; 3. Moreover, during the concrete pouring process, the pile head may inevitably fall into soil and other impurities. Therefore, the specifications stipulate that during concrete pile construction, the pile head elevation should be 500mm higher than the design elevation, and this part of the pile head should be manually removed to ensure the pile body strength. 4. Prevent the influence of concrete necking phenomenon caused by the lateral force of soil on the diameter of the pile body.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15201060490