Regularly inspect steel molds for cracks and replace them promptly. Also, check all connections of steel molds, the tightness and displacement of wall components, and reinforcing bars.
2. Operators are prohibited from moving wall connections without prior approval from the technical department, prior to the handover of shifts.
3. Thoroughly inspect the root binding of the dense mesh for looseness and check for any rope breaks. If any looseness is detected, it will be promptly retracted. If any damage is found, it will be immediately replaced. Clear away debris such as materials, bricks, concrete blocks, etc., from the hazardous areas near the steel formwork.




通过中商114认证 
